Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Platform Maintenance Works Along With Lifting And Shifting Of Test Weights For Round The Year Smooth Operation Of All The Weighbridges (Inmotion And Static) Of Bharatpur Ocp, Mcl On As And When Required Basis For A Period Of 365 Days.
|
Description |
Day To Day Platform Maintenance Works Along With Lifting And Shifting Of Test Weights For Round The Year Smooth Operation Of All The Weighbridges (Inmotion And Static) Of Bharatpur Ocp, Mcl On As And When Required Basis For A Period Of 365 Days.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_323311_1 |
Reference Number |
MCL/BA/EnM/e-Tender/242569 Dated 13.12.2024 |
Tender Fee | 0 |
EMD | 80100 |
Tender Value | |
Place | BHARATPUR OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335137 |
Start Date | December 14, 2024 15:30 |
End Date |
30/12/2024 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Day to day operation and maintenance of pump motor along with electrical maintenance at all katwa and kalna subdivison (addl. sp office campus (rural), force barrack, sdpo office, ef line) (325 days) form 11-05-2025 to 31-03-2026. (1st call)
Day to day operation and maintenance of pump motor along with electrical maintenance at all katwa and kalna subdivison (addl. sp office campus (rural), force barrack, sdpo office, ef line) (325 days) form 11-05-2025 to 31-03-2026. (1st call)
Read moreDay to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis
Day to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis
Read moreDay to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Read moreDay to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Read moreAnnual contract for day to day running maintenance of 07 nos of 50/60t capacity static road weighbridge at akk ocp bnk area for a period of 365 days.
Annual contract for day to day running maintenance of 07 nos of 50/60t capacity static road weighbridge at akk ocp bnk area for a period of 365 days.
Read moreDay to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.
Read moreDay to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.
Day to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.
Read moreInstallation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 60 days at bazari more under s.b. project.
Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 60 days at bazari more under s.b. project.
Read moreJob1. day to day oh line work such as erection dismantling shifting and branch di of lt overhead lines at voltage 220v/440v on as and when required basis for period of 01 year at different section of mines at ashok ocp under piparwar area.
Job1. day to day oh line work such as erection dismantling shifting and branch di of lt overhead lines at voltage 220v/440v on as and when required basis for period of 01 year at different section of mines at ashok ocp under piparwar area.
Read moreAnnual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast
Annual testing required for the stamping of 03 no weighbridges (kuya ocp, bastacolla ocp and bnr railway siding weighbridge) under bastacolla area and shifting of 01 time 20 tonne test weights i.e. 20 tonnes test weights from burragarh siding to bast
Read moreof your Industry type