Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Water Re Tank With Electric Pump At Sannyaghat Anwanwadi Centre 186
|
| Description |
Construction Of Water Re Tank With Electric Pump At Sannyaghat Anwanwadi Centre 186 Within Patchhara Under Coochbehar I Ps In District Coochbehar
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_709981_1 |
|
Reference Number |
NIT No. 04/PAT/2024-2025, Dt. 08/07/2024, SL 04 |
| Tender Fee | 500 |
| EMD | 3127 |
| Tender Value | |
| Place | PATCHHARA GP AREA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1555310 |
| Start Date | July 09, 2024 23:30 |
| End Date |
Expired
16/07/2024
Expired 735 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of drainage at mgr nagar in narasingarayanpettai
Construction of drainage at mgr nagar in narasingarayanpettai
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDetailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreConstruction of water re tank with electric pump at msk charakpara
Construction of water re tank with electric pump at msk charakpara within patchhara under coochbehar i ps in district coochbehar
Read moreConstruction of water re tank with electric pump at baronalangibari awc
Construction of water re tank with electric pump at baronalangibari awc within patchhara under coochbehar i ps in district coochbehar
Read moreConstruction of water re tank with electric pump at patchhara awc
Construction of water re tank with electric pump at patchhara awc within patchhara under coochbehar i ps in district coochbehar
Read moreConstruction of water re tank with electric pump at charakpara awc
Construction of water re tank with electric pump at charakpara awc within patchhara under coochbehar i ps in district coochbehar gp under cfcg-tied fund 2024-25
Read moreConstruction of water re tank with electric pump at chhoto nalangibari awc
Construction of water re tank with electric pump at chhoto nalangibari awc within patchhara under coochbehar i ps in district coochbehar
Read moreof your Industry type