Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Arrangement Of Interfacing, Integration Of 06 Nos Belt Weighers Of Chp Phase I With Khanij Portal Along With Stamping
|
| Description |
Arrangement Of Interfacing, Integration Of 06 Nos Belt Weighers Of Chp Phase I With Khanij Portal Along With Stamping
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_347688_1 |
|
Reference Number |
SECL/GM/KSM /EnM/eTender/25-26/99 |
| Tender Fee | 0 |
| EMD | 11400 |
| Tender Value | - |
| Place | KUSMUNDA OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=360395 |
| Start Date | November 20, 2025 15:30 |
| End Date |
Expired
02/12/2025
Expired 262 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
For selection of agency for design, development, deployment, integration and 5-year operation & maintenance of the bihar state solar energy data management (sedm) portal for connectivity with remote monitoring systems (rms) of feeder level solarisation and other solar plants under pm-kusum scheme (component c) and integration with the mnre national level sedm portal.
For selection of agency for design, development, deployment, integration and 5-year operation & maintenance of the bihar state solar energy data management (sedm) portal for connectivity with remote monitoring systems (rms) of feeder level solarisation and other solar plants under pm-kusum scheme (component c) and integration with the mnre national level sedm portal.
Read moreConstruction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)
Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)
Read moreIn ward no. 06, laying of the compound pipeline and home water connections along with related tap-water work in 220 houses by amrit mankanjmand jnda. group-02
In ward no. 06, laying of the compound pipeline and home water connections along with related tap-water work in 220 houses by amrit mankanjmand jnda. group-02
Read moreRenovation with addition & alteration to e/w & e/i along with cassette ac & split ac in principal secretary (gad) chamber, room nos. 135,19,20 ( record room), server room, beside ladies toilet and extra work ( electrical & networking) at gad, old sectt., patna
Renovation with addition & alteration to e/w & e/i along with cassette ac & split ac in principal secretary (gad) chamber, room nos. 135,19,20 ( record room), server room, beside ladies toilet and extra work ( electrical & networking) at gad, old sectt., patna
Read moreTurn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Turn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Read moreTurnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, muzaffarpur and motihari under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, muzaffarpur and motihari under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.
Read moreTurnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle begusarai, darbhanga, saharsa, kishanganj and purnea under package-3 envelope under o&m capital head/internal resource fund (irf), o&m department, nbpdcl
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle begusarai, darbhanga, saharsa, kishanganj and purnea under package-3 envelope under o&m capital head/internal resource fund (irf), o&m department, nbpdcl
Read moreRepairing of 04 nos of belt weighers installed at chp phase-1, kocp.
Repairing of 04 nos of belt weighers installed at chp phase-1, kocp.
Read moreRepairing of 04 nos of beltweighers installed at chp phase-1, kocp.
Repairing of 04 nos of belt weighers installed at chp phase-1, kocp.
Read moreBmc of belt weighers of chp at ntpc simhadri
Bmc of belt- weighers of chp at ntpc simhadri
Read moreof your Industry type