Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Triennial Maintenance Contract Of Ipa Make Chp Conveyor Belt Weighers Atntpc Kudgi.
|
| Description |
Triennial Maintenance Contract Of Ipa Make Chp Conveyor Belt Weighers Atntpc Kudgi.
|
| Organisation | NTPC Limited(NTPC) |
| Tender Id | 2023_NTPC_81748_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900269494 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Simhadri Super Thermal Power |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in |
| Start Date | November 29, 2023 23:30 |
| End Date |
Expired
12/12/2023
Expired 1035 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana
Procurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreProcurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Read moreTggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings
Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreProcurement of ipa make controllers for belt weighers in the chp for
Procurement of ipa make controllers for belt weighers in the chp forntpc darlipali
Read moreBiennial maintenance contract of ipa make mhp conveyor belt weighers at ntpc telangana
Biennial maintenance contract of ipa make mhp conveyor belt weighers at ntpc telangana
Read moreof your Industry type