Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Work
|
Description |
Special Repairs To Damaged Wall Panelling In Director Chamber, Damaged Walls, Doors An S, Toilet Flooring, Water Supply An Sanitary Arrangements And Other Repair Works To Directorate Building In Motor Vehicle Maintenance Department At Velachery
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_443071_1 |
Reference Number |
TNPWD/38-03/31 M/2023-2024 |
Tender Fee | 0 |
EMD | 9500 |
Tender Value | |
Place | Velachery |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=527379 |
Start Date | March 07, 2024 14:30 |
End Date |
08/03/2024 ( Expired 443 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreTolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreRfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreProcurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreRound the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Read moreAnnual maintenance service - desktops, laptops and peripherals - desktop pc; hp,annual maintenance
Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreof your Industry type