Tender Details
Particulars | Details |
---|---|
Title |
Construction Improvement Of Rishi Rongli Kupup Road From Cl 9 To Nhdl Specifications Through Epc Mode Between Existing Km 53.00 Design Km 55.440 To Existing Km 70.00 Design Km 74.575 Net Design Length 19.135 Km Under 130 Rcc 764 Brtf Under Project
|
Description |
Construction Improvement Of Rishi Rongli Kupup Road From Cl 9 To Nhdl Specifications Through Epc Mode Between Existing Km 53.00 Design Km 55.440 To Existing Km 70.00 Design Km 74.575 Net Design Length 19.135 Km Under 130 Rcc 764 Brtf Under Project
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2025_BRO_692358_1 |
Reference Number |
CE(P)SWTK/01/2024-25/EPC |
Tender Fee | 30000 |
EMD | 4.47 Crore |
Tender Value | |
Place | Between Km 53.00 to 70.00 on RRK Road |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=775099 |
Start Date | February 08, 2025 14:30 |
End Date |
10/03/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode
Upgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read morePlc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for ase for supervision of constr of dslc road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km) under (p) vtk in the state of arunachal pradesh through epc mode
Read moreConstr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Constr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreImprovement strengthening of road from burighat to sermunii in tripura length 15862 km under nesidsroads on engineering procurement construction epc mode
Improvement strengthening of road from burighat to sermunii in tripura length 15862 km under nesidsroads on engineering procurement construction epc mode
Read moreConstr/impvt of road birdhwal-puggal-bajju between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc
Constr/impvt of road b-p-b between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc mode
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreof your Industry type