Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🌉 Procurement Opportunity: Design And Construction Of A Psc Box Girder Superstructure For A Bridge 🏗️🛣️ The Dte General Border Roads Organisation, Under The Central Government, Invites Tenders From Reputable Firms For The Design, Including Proof Checking Of Design And Drawings, And Construction Of A 40 Meter Span Psc Box Girder Superstructure For A Pmt Bridge Over Lingtham Khola At Km 30.00 On The Rishi Rongli Kupup Road. 📅 Bid Submission Deadline: May 02, 2024, 12:00 Pm A Tender Security Amount Of Inr 477,000/ Is Required With The Earnest Money Deposit (Emd). Interested Bidders Should Possess The Necessary Expertise In Bridge Design And Construction As Per Irc 70 R And Demonstrate Their Capability To Adhere To The Project Timelines And Quality Standards. Keywords: Bridge Construction, Psc Box Girder Superstructure, Design And Proof Check, Border Roads Organisation, Central Government, Tender, Emd, Lingtham Khola, Rishi Rongli Kupup Road| Particulars | Details |
|---|---|
| Title |
Ssi, Design Including Proof Check Of Design And Drawings And Construction Of 40 Mtr Span Irc 70 R Psc Box Girder Superstructure Pmt Bridge On Open Foundation Over Lingtham Khola At Km 30.00 On Rishi Rongli Kupup Road Under 130 Rcc/764 Tf (P) Swastik In
|
| Description |
Ssi, Design Including Proof Check Of Design And Drawings And Construction Of 40 Mtr Span Irc 70 R Psc Box Girder Superstructure Pmt Bridge On Open Foundation Over Lingtham Khola At Km 30.00 On Rishi Rongli Kupup Road Under 130 Rcc/764 Tf (P) Swastik In
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2024_BRO_649729_1 |
|
Reference Number |
80578 |
| Tender Fee | 0 |
| EMD | 4.77 Lakh |
| Tender Value | - |
| Place | AT KM 30.00 ON RISHI-RONGLI-KUPUP ROAD |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=727359 |
| Start Date | April 18, 2024 19:30 |
| End Date |
Expired
02/05/2024
Expired 896 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Read moreSsi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Ssi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Read moreDesign, drawing, ssi and constr of 75 m single span maj steel superstructure pmt br (70r) at km 1.310 on rd moreh-thingphai-new samtal under (p) sewak in manipur state
Design, drawing, ssi and constr of 75 m single span maj steel superstructure pmt br (70r) at km 1.310 on rd moreh-thingphai-new samtal under (p) sewak in manipur state
Read moreSsi, design including proof check of design and drawings and construction of 40 mtr span irc 70r psc box girder superstructure pmt bridge on open foundation over lingtham khola at km 30.00 on rishi-rongli-kupup road under 130 rcc
Ssi, design including proof check of design and drawings and construction of 40 mtr span irc 70r psc box girder superstructure pmt bridge on open foundation over lingtham khola at km 30.00 on rishi-rongli-kupup road under 130 rcc
Read moreDesign and construction of 85.00 m span major pmt steel super structure bridge through type on open foundation over quikhola at km 34.50 including ssi on road rishi-rongli-kupup under 130 rcc/764 brtf /project swastik in the state of sikkim job no 30
Design and construction of 85.00 m span major pmt steel super structure bridge through type on open foundation over quikhola at km 34.50 including ssi on road rishi-rongli-kupup under 130 rcc/764 brtf /project swastik in the state of sikkim job no 30
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreSupply and stacking of crushed stone aggregates of various sizes and coarse sand (dry) for permanent works between design chainage km 50.615 to design chainage km 55.440 on rishi-rongli-kupup road under 130 rcc/764 brtf/ project swastik
Supply and stacking of crushed stone aggregates of various sizes and coarse sand (dry) for permanent works between design chainage km 50.615 to design chainage km 55.440 on rishi-rongli-kupup road under 130 rcc/764 brtf/ project swastik
Read moreExecution of surfacing works of road rishi-rongli-kupup from cl-9 to nhdl specifications in between km 47.200 and 54.800 net length 4.50 km under 130 rcc/764 brtf/project swastik in the state of sikkim job no 309/290
Execution of surfacing works of road rishi-rongli-kupup from cl-9 to nhdl specifications in between km 47.200 and 54.800 net length 4.50 km under 130 rcc/764 brtf/project swastik in the state of sikkim job no 309/290
Read moreConstruction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project
Construction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project
Read moreSupply and stacking of crushed stone aggregates of various sizes and stone dust (dry) between km 45.00 to km 53.00 (designed chainage between km 45.79 to km 55.44) on rishi-rongli-kupup road for pmt works under 130 rcc/764 brtf under project swastik
Supply and stacking of crushed stone aggregates of various sizes and stone dust (dry) between km 45.00 to km 53.00 (designed chainage between km 45.79 to km 55.44) on rishi-rongli-kupup road for pmt works under 130 rcc/764 brtf under project swastik
Read moreof your Industry type