Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Fixing Of Conveyor Pre Alarms/Sirens At Silent Zones Along P1 Q1 R1 And P2 Q2 R2 Conveyors Of New Chp, Dep.
|
Description |
Providing And Fixing Of Conveyor Pre Alarms/Sirens At Silent Zones Along P1 Q1 R1 And P2 Q2 R2 Conveyors Of New Chp, Dep.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_322953_1 |
Reference Number |
SECL/GM(M)/DEP/GM(EnM)/ e-tender/24-25/01 dtd-07/12/24 |
Tender Fee | 0 |
EMD | 1000 |
Tender Value | |
Place | Dipka Expansion Project, Dipka Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334766 |
Start Date | December 10, 2024 15:30 |
End Date |
20/12/2024 ( Expired 177 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreSitc of 400kv circuit breaker and dismantling of old cbs
Supply installation testing and commissioning of new 400kv 63ka for 1 sec 3150a circuit breakers outdoor sf6 type without pir along with support structure and accessories etc and dismantling of old or outlived 400kv circuit breakers
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreSupply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreSpecial repair of primary runway (19l/01r) along with portion of secondary runway (19r/01l) at junction of rwy 19r/01l with txy b and txy e at nscbi airport, kolkata
Special repair of primary runway (19l/01r) along with portion of secondary runway (19r/01l) at junction of rwy 19r/01l with txy b and txy e at nscbi airport, kolkata.19r/01l at junction of rwy 19r/ 01l with txy b and txy e
Read moreProcurement of spare charge of pre reformer catalyst along with support balls for plant 205 and 214 (hgu)
Procurement of spare charge of pre reformer catalyst along with support balls for plant 205 and 214 (hgu)
Read moreof your Industry type