Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Constr Of Ug Ops Room Rcc Framed Structure And Pcc Block Masonry And Retaining Wall,Reta
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5209031 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 26, 2024 14:56 |
| End Date |
Expired
17/08/2024
Expired 684 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rehabilitation of water supply and water storage infrastructure including waterproofing treatment, leakage/seepage rectificication of oht, ug sump and other water retaining structures at chafb
Rehabilitation of water supply and water storage infrastructure including waterproofing treatment, leakage/seepage rectificication of oht, ug sump and other water retaining structures at chafb
Read moreRepair/maint of water supply distribution at pocket ii, repair/maint of ro plants , cleaning of oht, semi ug sumps, rcc/pvc tanks and connected works at chaf bangalore
Repair/maint of water supply distribution at pocket ii, repair/maint of ro plants , cleaning of oht, semi ug sumps, rcc/pvc tanks and connected works at chaf bangalore
Read moreRepair / maint of external electric supply, lt ug cable, lt panels and other allied works at af station dwarka and khambhaliya under ge (af) jamnagar no.2
Repair / maint of external electric supply, lt ug cable, lt panels and other allied works at af station dwarka and khambhaliya under ge (af) jamnagar no.2
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreMaintenance contract for civil works of non ops area i.e. cityside of otb (t1), parking area (t1), aai offices, colony,new atc tower, technical block,cisf offices, barracks , cargo and ancillary area for 24 months 2026-28 at d.a.b.h. airport, indore.
Maintenance contract for civil works of non ops area i.e. cityside of otb (t1), parking area (t1), aai offices, colony,new atc tower, technical block,cisf offices, barracks , cargo and ancillary area for 24 months 2026-28 at d.a.b.h. airport, indore.
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreProvn of toilet block at 9 rajput and boundary wall with main gate at ecib at tezu under ge (p) lohitpur
Provn of toilet block at 9 rajput and boundary wall with main gate at ecib at tezu under ge (p) lohitpur
Read moreSupply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Supply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read moreSupply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hoste
Supply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hostel at csir ccmb
Read moreof your Industry type