Tender Details
Particulars | Details |
---|---|
Title |
Set Of Six Hand Ni Ti Tapered Files 25 Mm Length With Corresponding Gutta Percha Points And Paper Po
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2024/B/5557975 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | November 06, 2024 19:00 |
End Date |
27/11/2024 ( Expired 147 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Development of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Read moreConstruction of works related to construction of 125 mm dia hand pump,with cement concrete platefrom by dth driling with long cashing and commision with required materials for hand pump, in all respect in ps aburoad region (distt-sirohi)with difect l
Construction of works related to construction of 125 mm dia hand pump,with cement concrete platefrom by dth driling with long cashing and commision with required materials for hand pump, in all respect in ps aburoad region (distt-sirohi)with difect l
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreWork of const and comm of 01 no bore hole by odex rig of 200 mm dia, supply and installation of energy efficient sub pump set, panel cables including commissioning and testing of tube well and replacement of existing nrv and starter with 24 months dl
Work of const and comm of 01 no bore hole by odex rig of 200 mm dia, supply and installation of energy efficient sub pump set, panel cables including commissioning and testing of tube well and replacement of existing nrv and starter with 24 months dl
Read moreSupply of 32 mm gi pipe medium class b with pipe sockets heavy duty and supply of connecting rod as per departmental specifications of 3 meter length isi mark amended up to date for division banswara
Supply of 32 mm gi pipe medium class b with pipe sockets heavy duty and supply of connecting rod as per departmental specifications of 3 meter length isi mark amended up to date for division banswara
Read moreSupply of 32 mm gi pipe medium class b with pipe sockets heavy duty and supply of connecting rod as per departmental specifications of 3 meter length isi mark amended up to date for division bagidora
Supply of 32 mm gi pipe medium class b with pipe sockets heavy duty and supply of connecting rod as per departmental specifications of 3 meter length isi mark amended up to date for division bagidora
Read moreProviding, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Providing, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Read moreProviding, laying and compaction of bituminous concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer km 0.000 to km 12.000 (net linear length 11.645 km) on road meshai - dichu (2n call)
Providing, laying and compaction of bituminous concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer km 0.000 to km 12.000 (net linear length 11.645 km) on road meshai - dichu (2n call)
Read moreDrilling of 150 mm dia 150 m deep tube well with installation of india mark hand pump including construction of platform complete etc. work labor and material at site ward 62 file no. 141/25x9/1
Drilling of 150 mm dia 150 m deep tube well with installation of india mark hand pump including construction of platform complete etc. work labor and material at site ward 62 file no. 141/25x9/1
Read moreof your Industry type