Tender Details

Particulars Details
Title
Replacement Tubewell Boring At Existing Tubewell I
Description
1)tw Boring 500 Mm 01 Qty: 1 No 2)tw Boring 500 Mm 02 Qty: 110 Mr 3)tw Boring 500 Mm 03 Qty: 75 Mr 4)tw Boring 500 Mm 04 Qty: 35 Mr 5)tw Boring 500 Mm 05 Qty: 1 No 6)tw Boring 500 Mm 11 Qty: 100 Mr 7)tw Boring 500 Mm 07 Qty: 220 Qt 8)tw Boring 500 Mm 08 Qty: 1 No 9)tw Boring 500 Mm 09 Qty: 1 No 10)tw Boring 500 Mm 10 Qty: 1 No
Organisation Bharat Heavy Electricals Limited | Public Sector Undertakings
Tender Id HEEP-W-202500741
Reference
Number
HEEP-W-202500741
Tender Fee 0
EMD 0
Tender Value -
Place Haridwar
Link
View Original Tender Notice

http://www.bhelhwr.co.in

Start Date June 04, 2025 20:30
End Date
Expired 16/06/2025

Expired 475 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Boring deep tubewell

Boring deep tubewell at sukanta shishu shiksha kendra at part no 10/288

Read more
Boring deep tubewell

Boring deep tubewell near saroda ssk at part no 10/287

Read more
Boring deep tubewell

Boring deep tubewell near gour das sethi sanga at part no 10/295

Read more
Boring deep tubewell

Boring deep tubewell near the house of mithun das at part no 10/297

Read more
Replacement of tube well boring at existing tube well in bhel township

Replacement of tube well boring at existing tube well in bhel township

Read more
20 hp tubewell boring

Np bahadurganj ghazipur puraniganj me gurja wayar ke pass 20 hp tubewell boring

Read more
Boring of tubewell at 33 kv substation lukhi.

Boring of tubewell at 33 kv substation lukhi.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise