Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Iv Replacing The Existing Defective Variable Load Hangers And Constant Load Hangers By New Variable Constant Load Hangers After Providing Necessary Scaffolding And Supporting Arrangements During Unit Iv Aoh Period
|
Description |
Mtps I Tm Unit Iv Replacing The Existing Defective Variable Load Hangers And Constant Load Hangers By New Variable Constant Load Hangers After Providing Necessary Scaffolding And Supporting Arrangements During Unit Iv Aoh Period
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463959_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 114 / 2024-25 |
Tender Fee | 0 |
EMD | 4900 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551394 |
Start Date | July 18, 2024 23:10 |
End Date |
24/07/2024 ( Expired 295 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Read moreMtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Mtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Read moreMtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Read moreMtps i bm unit i boiler pressure parts aoh 2025 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate
Mtps i bm unit i boiler pressure parts aoh 2025 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreMtps i tm carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs rhs of condenser tubes in unit i condenser during aoh of 2025 26
Mtps i tm carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs rhs of condenser tubes in unit i condenser during aoh of 2025 26
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreof your Industry type