Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Tneb Limited Procurement Notice: Replacement Of Variable Load Hangers 🛠️ Tneb Limited, As Part Of The State Government And Ut, Is Initiating A Procurement Process For The Replacement Of Defective Variable Load Hangers At Mettur Thermal Power Station I/Mettur Dam. This Project Is Under The Ambit Of Unit Iii's Annual Overhauling (Aoh). 📅 Bid Submission Deadline: April 19, 2024, 2:00 Pm Interested Bidders Are Required To Submit An Earnest Money Deposit (Emd) Of Inr 38,000. No Tender Fee Is Applicable. Bidders Must Provide Detailed Proposals, Including The Methodology For Scaffolding And Supporting Arrangements, To Ensure The Safe And Efficient Replacement Of The Hangers. Keywords: Tneb Limited, Mtps I Tm Unit Iii, Variable Load Hangers, Scaffolding, Power Station, Aoh, State Govt. And Ut, Procurement, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit Iii Replacing The Existing Defective Variable Load Hangers By New Variable Load Hangers After Providing Necessary Scaffolding And Supporting Arrangements During Unit Iii Aoh
|
| Description |
Mtps I Tm Unit Iii Replacing The Existing Defective Variable Load Hangers By New Variable Load Hangers After Providing Necessary Scaffolding And Supporting Arrangements During Unit Iii Aoh
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_428387_1 |
|
Reference Number |
CE /MTPS-I/ SE/ M-I /TM / OT.403 / 2023-24 |
| Tender Fee | 0 |
| EMD | 3800 |
| Tender Value | |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509388 |
| Start Date | February 21, 2024 17:40 |
| End Date |
Expired
19/04/2024
Expired 781 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit i replacing the existing defective constant and variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2024
Mtps i tm unit i replacing the existing defective constant and variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2024
Read moreMtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Mtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Read moreMtps i tm unit iv replacing the existing defective variable load hangers and constant load hangers by new variable constant load hangers after providing necessary scaffolding and supporting arrangements during unit iv aoh period
Mtps i tm unit iv replacing the existing defective variable load hangers and constant load hangers by new variable constant load hangers after providing necessary scaffolding and supporting arrangements during unit iv aoh period
Read moreMtps i tm unit ii replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit ii coh 2024
Mtps i tm unit ii replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit ii coh 2024
Read moreMtps i tm unit iii replacing the existing defective vent condenser tube nest by spare tube nest in unit iii during aoh 2024 25
Mtps i tm unit iii replacing the existing defective vent condenser tube nest by spare tube nest in unit iii during aoh 2024 25
Read moreMtps i tm unit iii replacing the existing defective vent condenser tube nest by spare tube nest in unit iii during 2025 26
Mtps i tm unit iii replacing the existing defective vent condenser tube nest by spare tube nest in unit iii during 2025 26
Read moreMtps i tm unit ii replacing the existing defective vent condenser tube nest by a retubed spare tube nest in unit ii during unit shutdown period
Mtps i tm unit ii replacing the existing defective vent condenser tube nest by a retubed spare tube nest in unit ii during unit shutdown period
Read moreMtps i tm unit i providing new rubber lining at surface area of phosphate and hydrazine chemical tanks by replacing the existing damaged lining overhauling and assembling of stirrer mechanism during aoh 2024 2025
Mtps i tm unit i providing new rubber lining at surface area of phosphate and hydrazine chemical tanks by replacing the existing damaged lining overhauling and assembling of stirrer mechanism during aoh 2024 2025
Read moreMtps i tm unit ii providing new rubber lining at inner surface area of phosphate and hydrazine chemical tanks by replacing the existing damaged lining overhauling and assembling of stirrer mechanism during aoh 2023 2024
Mtps i tm unit ii providing new rubber lining at inner surface area of phosphate and hydrazine chemical tanks by replacing the existing damaged lining overhauling and assembling of stirrer mechanism during aoh 2023 2024
Read moreNctps i se mi circle aoh 24 25 tm dn unit iii dismantling of bearing pedestal no 1 to 5
Nctps i se mi circle aoh 24 25 tm dn unit iii dismantling of bearing pedestal no 1 to 5 inspection oil clearance checking correction reassembling after replacing the new tsi sensors by c i and checking the jack oil hoses of bearing no 1 to 5
Read moreof your Industry type