Tender Details
Particulars | Details |
---|---|
Title |
Jjm Ittiva Phase Ii Providing Additional Line Extension And Balance Fht Cs (1744 Numbers)in Ittiva Gramapanchayath Phase Ii Balance Work For Providing Inline Boosting To Elevated Zones In Ittiva Gramapanchayath
|
Description |
Jjm Ittiva Phase Ii Providing Additional Line Extension And Balance Fht Cs (1744 Numbers)in Ittiva Gramapanchayath Phase Ii Balance Work For Providing Inline Boosting To Elevated Zones In Ittiva Gramapanchayath
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2025_KWA_753777_1 |
Reference Number |
Re T No.182/2024-25/SE/Q |
Tender Fee | 8270 |
EMD | 1 Lakh |
Tender Value | |
Place | Ittiva grama panchayath |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1223597 |
Start Date | March 21, 2025 23:30 |
End Date |
04/04/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read morePreparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Read moreProviding assistance for eot crane hoist and light during oh unit no 6
Providing prive and breakdown maintenance support for eot crane , hoists installed in different areas of 2x250 mw and providing assistance for additional power supply support to all working division of ctps parichha during overhauling of unit no
Read moreCivil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreWork of pipe line extension from alok singh tube well to harishankar house and from rambadhai house to kinnu yadav house in ward no. 7 tilkari.
Work of pipe line extension from alok singh tube well to harishankar house and from rambadhai house to kinnu yadav house in ward no. 7 tilkari.
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii
Construction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii
Read moreKaliteer water supply project based on hybird annuity model (ham) ace (p) bharatpur nit no.03/2024-25
Work for construction of water treatment plants cwrs and cwphs near wtps clear water transmission main from wtp various ipss laying of rising mains to different esrs construction of esrs distribution system in villages providing fhtcs including
Read moreof your Industry type