Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Laying Of Rcc Pipe With Excavation ,Joining And Refiting Etc.
|
| Description |
Supply And Laying Of Rcc Pipe With Excavation ,Joining And Refiting Etc.
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_DMA_925015_1 |
|
Reference Number |
E Tender Notice No. 6 2023-24_4 |
| Tender Fee | 2000 |
| EMD | 20000 |
| Tender Value | - |
| Place | MC Saswad |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | July 13, 2023 22:55 |
| End Date |
Expired
27/07/2023
Expired 1157 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreLaying underground rcc pipe...
Estimate for laying underground rcc pipe line 350mm np3 of achlana pond village dhigawa shamiyan from hodi no 03 of existing pipeline offtaking from tail of kari tokha sub minor
Read moreof your Industry type