Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Existing Protection Work In Between Stone Spur Iv To Stone Spur V Of Dtp Dyke At Dibrugarh For River Brahmaputra.
|
| Description |
Strengthening Of Existing Protection Work In Between Stone Spur Iv To Stone Spur V Of Dtp Dyke At Dibrugarh For River Brahmaputra.
|
| Organisation | Department of Water Resources | State Govt. and UT |
| Tender Id | 2026_DoWR_51883_1 |
|
Reference Number |
DIBRUGARH/2025-26/NDMA/I |
| Tender Fee | 20000 |
| EMD | 23.92 Lakh |
| Tender Value | - |
| Place | DTP Dyke, Dibrugarh |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=82233 |
| Start Date | March 14, 2026 15:30 |
| End Date |
Expired
18/03/2026
Expired 209 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Morphological survey at 31 no cross section of river brahmaputra from dibrugarh to tezpur under ubd dibrugarh, bbo, cwc during the fy 2026-27
Morphological survey at 31 no cross section of river brahmaputra from dibrugarh to tezpur under ubd dibrugarh, bbo, cwc during the fy 2026-27
Read moreProviding of strengthening arrangements to 5 inch dia gi pipe line laid in palar river between bore wells to 40hp sump at panagattucherry village
Providing of strengthening arrangements to 5inch dia gi pipe line laid in palar river between bore wells no 07 and 08 09 and 10 to 40hp sump at panagattucherry village
Read moreContretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Read moreStrengthening slope stabilization and toe protection of vulnerable and weak embankment of river jhelum at rd 91 km ds for a length of 50 mtrs
Strengthening slope stabilization and toe protection of vulnerable and weak embankment of river jhelum at rd 91 km ds for a length of 50 mtrs
Read moreRepair to bridge over river kusumi on saradhapur-bhadikila-ostia road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to bridge over river kusumi on saradhapur-bhadikila-ostia road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreRepair to hl bridge over river kusumi on kadalibandha to gunthasahi road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to hl bridge over river kusumi on kadalibandha to gunthasahi road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreConstruction/ strengthening/ repair and restoration of protection works by way of repair of crates/ laying of crates for the year 2026-27 on right bank of river chenab and local nallahs under jurisdiction of flood control sub- division i akhnoor.
Construction/ strengthening/ repair and restoration of protection works by way of repair of crates/ laying of crates for the year 2026-27 on right bank of river chenab and local nallahs under jurisdiction of flood control sub- division i akhnoor.
Read moreProtection of dtp dyke from stone spur no. iv to viii and aithan bund from the erosion of river brahmaputra- ph-i, package 3
Protection of dtp dyke from stone spur no. iv to viii and aithan bund from the erosion of river brahmaputra- ph-i.
Read moreWidening and strengthening of b/dyke from nikinikhowa to no.1 spur at karalgaon.
Widening and strengthening of b/dyke from nikinikhowa to no.1 spur at karalgaon.
Read moreProtection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreof your Industry type