Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ktps Vi Stage Bm Overhauling Works Of Air Pre Heaters For 1 X500 Mw Boiler During The Annual Overhaul Period For The Year 2025 2026
|
| Description |
Ktps Vi Stage Bm Overhauling Works Of Air Pre Heaters For 1 X500 Mw Boiler During The Annual Overhaul Period For The Year 2025 2026.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 628512 |
|
Reference Number |
e-41/2025-26/SE/OM/BM/KTPS-VI |
| Tender Fee | 412 |
| EMD | 17447 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | September 09, 2025 01:30 |
| End Date |
Expired
25/09/2025
Expired 388 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Supply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreTggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Read moreAir cell for 80mva station transformer in ktps-vi stage
Air cell for 80mva station transformer in ktps-vi stage
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreKtps-vii stage-procurement of axial piston pumps and hydraulic drives for stacker cum reclaimers in chp of ktps-vii stage (1x800 mw)
Ktps-vii stage-procurement of axial piston pumps and hydraulic drives for stacker cum reclaimers in chp of ktps-vii stage (1x800 mw)
Read moreBmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Bmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Read moreProcurement of fins for application in waterwall and steam cooled wall for boiler of 1x500 mw unit at sgtps , mppgcl, birsinghpur.
Procurement of fins for application in waterwall and steam cooled wall for boiler of 1x500 mw unit at sgtps , mppgcl, birsinghpur.
Read moreProcurement of paph air outlet damper and hot primary air control damper installed at boiler of 1x500 mw unit, sgtps, mppgcl, birsinghpur.
Procurement of paph air outlet damper and hot primary air control damper installed at boiler of 1x500 mw unit, sgtps, mppgcl, birsinghpur.
Read moreof your Industry type