Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Biennial Maintenance Of Civil Works In Ash Pond Area For The Years
|
| Description |
Biennial Maintenance Of Civil Works In Ash Pond Area For The Years2024 26 For Ntpc Solapur
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2024_NTPC_89113_1 |
|
Reference Number |
NTPC/USSC-CPG1/9900284710 |
| Tender Fee | 2655 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | NTPC SOLAPUR |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=92300 |
| Start Date | August 02, 2024 17:30 |
| End Date |
Expired
04/09/2024
Expired 751 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreAsh dyke civil maintenance works at mtps ash pond, dvc
Ash dyke civil maintenance works at mtps ash pond, dvc
Read moreAsh dyke civil maintenance works at ash pond of mtps, dvc
Ash dyke civil maintenance works at ash pond of mtps, dvc
Read moreCivil maintenance works in the water fall pond
Civil maintenance works in the water fall pond
Read moreof your Industry type