Tender Details
Particulars | Details |
---|---|
Title |
Wbpwd Roads Eebnhdnit09/23 24 8
|
Description |
Mtc. And Repair Work To Karjona Muratipur Natunhat Road From 7.00 Kmp To 12.00 Km By Bituminious Potholes And Seal Coat (Type B) In Stretches Under Bhatar Highway Sub Division No. I Of Burdwan North Highway Division In The District Of Purba Bardhaman
|
Organisation | Government of West Bengal |
Tender Id | 2023_WBPWD_605253_8 |
Reference Number |
WBPWDRoadsEEBNHDNIT09/23-2024 |
Tender Fee | |
EMD | 8653 |
Tender Value | |
Place | Executive Engineer Burdwan North Highway Division |
Link | https://wbtenders.gov.in |
Start Date | November 24, 2023 22:00 |
End Date |
01/12/2023 ( Expired 537 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreAAAAAAAAAA
Login to viewDevelopment of distribution infrastructure of 11 kv feeders&#x0d (urban and industrial) emanating from 66 kv sub-stations sector&#x0d 46, 21d, nh3 of faridabad circle, dhbvn under revamped&#x0d reforms-based and results-linked, distribution sector&#x0d scheme
Read moreSub base basketball court 94 x 54 sq ft,synthetic 8 layer cushion system itf approved,led flood lig
Read more
Construction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreSpecial repairs to bldg no. t-105 (vsk) and roof treatment to bldg no p-17, p-21, p-22, p-24 and provn of two wheeler mt shed at cg complex under ge ludhiana
Special repairs to bldg no. t-105 (vsk) and roof treatment to bldg no p-17, p-21, p-22, p-24 and provn of two wheeler mt shed at cg complex under ge ludhiana
Read moreof your Industry type