Tender Details

Particulars Details
Title
Construction Of 36.00 Mtrs. Span Rcc Bow String Arch Bridge Over Mrl 01 Banjar Bathad Road Km. 9.450 In District Kullu Hp Under Pmgsy Iii.
Description
Construction Of 36.00 Mtrs. Span Rcc Bow String Arch Bridge Over Mrl 01 Banjar Bathad Road Km. 9.450 In District Kullu Hp Under Pmgsy Iii.
Organisation National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department
Tender Id 2025_CEHP_138956_1
Reference
Number
No. 11179-11278 dated 14-02-2025
Tender Fee 5000
EMD 11.15 Lakh
Tender Value
Place Banjar
Link https://pmgsytendershp.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=217405
Start Date February 16, 2025 23:00
End Date

22/02/2025 ( Expired 106 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Constr of bow string steel arch major bridge

Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the&#x0d kozhikode district of kerala state anakkampoyil kalladi meppadi package i

Read more
Construction of mipi-andrathang road from km 20.000 to 50.000

Construction of mipi-andrathang road from km 20.000 to 50.000&#x0d (design length 34.880 km between km 20.000 to 54.880)green field&#x0d alignment to nhsl specifications in the aor of 62 rcc under 752 brtf&#x0d of project udayak in arunachal pradesh state

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569

Read more
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.

Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.

Read more
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.

Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.

Read more
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh

Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh

Read more
Construction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024

Construction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise