Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Rfp: Construction Of Bow String Steel Arch Major Bridge ๐๏ธ๐ Konkan Railway Corporation Ltd., A Public Sector Undertaking, Has Issued A Request For Proposal (Rfp) For The Construction Of Two Bow String Steel Arch Major Bridges Across The River Iravanjippuzha In The Kozhikode District Of Kerala State, Under The Anakkampoyil Kalladi Meppadi Package I. ๐ Submission Deadline: April 16, 2024, 3:00 Pm Tender Fee: Inr 11,800 Emd: Inr 93,12,000 Interested Contractors Must Possess The Requisite Expertise And Experience In Bridge Construction, With A Proven Track Record Of Similar Projects. Proposals Should Encompass Detailed Design, Engineering, Construction Methodology, And Cost Estimates, Adhering To The Project Specifications And Timelines. Keywords: Bow String Steel Arch Major Bridge, Construction, Rfp, Konkan Railway Corporation Ltd, Public Sector Undertaking, Bridge Construction, Kerala State, Anakkampoyil Kalladi Meppadi Package I| Particulars | Details |
|---|---|
| Title |
Constr Of Bow String Steel Arch Major Bridge
|
| Description |
Rfp For Construction Of Bow String Steel Arch Major Bridge (2 Nos) Across River
Iravanjippuzha In The Kozhikode District Of Kerala State Anakkampoyil Kalladi Meppadi Package I
|
| Organisation | Konkan Railway Corporation Ltd. | Public Sector Undertakings |
| Tender Id | 2023_KRCL_175299_1 |
|
Reference Number |
- |
| Tender Fee | 11800 |
| EMD | 93.12 Lakh |
| Tender Value | - |
| Place | River Iravanjippuzha |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=191951 |
| Start Date | November 29, 2023 15:30 |
| End Date |
Expired
16/04/2024
Expired 915 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying out quality assessment audit of structural steel fabrication and surface coating of 2 nos shop fabricated and erected bow string bridge girder spans as well as 1 no shop fabricated bow string girder span
Carrying out quality assessment audit of structural steel fabrication and surface coating of 2 nos shop fabricated and erected bow string bridge girder spans as well as 1 no shop fabricated bow string girder span
Read moreHiring of service for prep of arch and structural drawing of the work constr of radar gun control
Hiring of service for prep of arch and structural drawing of the work constr of radar gun control
Read moreAssy d shackle,assy bow shackle,die for d shackle,die for bow shackle
Assy d shackle,assy bow shackle,die for d shackle,die for bow shackle
Read moreBow assembly fixed with metallised carbon strip
Bow assembly fixed with metallised carbon strip
Read moreof your Industry type