Tender Details

Particulars Details
Title
Maintenance Of Different Road Under Jampui Hill Sub Division, Pwd(r And B) During The Year 2023 2024/Sh Paver Block,Tack Coat,Carpeting,Seal Coat, Earth Work, Sand Filling, Pcc Etc.
Description
Maintenance Of Different Road Under Jampui Hill Sub Division, Pwd(r And B) During The Year 2023 2024/Sh Paver Block,Tack Coat,Carpeting,Seal Coat, Earth Work, Sand Filling, Pcc Etc.
Organisation Government of Tripura
Tender Id 2023_CEPWD_41074_1
Reference
Number
49/EE/KCP/2023-2024
Tender Fee 1000
EMD 48384
Tender Value -
Place o/o Executive Engineer, Kanchanpur Division PWD
Link
View Original Tender Notice

https://tripuratenders.gov.in

Start Date August 23, 2023 00:00
End Date
Expired 11/09/2023

Expired 1131 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Surf wk incl, gsb, wmm, bc, dbm incl prime coat, tack coat and earth filling and edge marking with thermo plastic paint bet km 0.00 to km 9.00 and km 14.00 to km 22.00 on road zingki bridge to pungro under project sewak in nagaland state

Surf wk incl, gsb, wmm, bc, dbm incl prime coat, tack coat and earth filling and edge marking with thermo plastic paint bet km 0.00 to km 9.00 and km 14.00 to km 22.00 on road zingki bridge to pungro under project sewak in nagaland state

Read more
Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.

Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.

Read more
Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Read more
Construction of pcc road with earth filling and rcc drain with slab from the home of harendra paswan towards the home of shankar paswan in ward no.07 of nagar panchayat karakat.

Construction of pcc road with earth filling and rcc drain with slab from the home of harendra paswan towards the home of shankar paswan in ward no.07 of nagar panchayat karakat.

Read more
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.

Read more
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.

Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.

Read more
Upgradation of tand kalsan and links road,district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii, 50 mm thick bm and 25 mm thick ogpc and 6mm thick seal coat

Upgradation of tand kalsan and links road,district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii, 50 mm thick bm and 25 mm thick ogpc and 6mm thick seal coat

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Mtc. of jampui hill helipad and approach under jampui hill sub division, pwd(r and b) during the year 2023 2024 sh earth work, pcc and rcc work, wbm,tack coat,carpeting, seal coating, pucca drain etc.

Mtc. of jampui hill helipad and approach under jampui hill sub division, pwd(r and b) during the year 2023 2024 sh earth work, pcc and rcc work, wbm,tack coat,carpeting, seal coating, pucca drain etc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise