Tender Details

About Tender

🛣️ Consultancy Opportunity: Widening And Strengthening Of Highway 🛣️ The Central Engineering Service (Nh) Under The State Government And Union Territories (Ce Nh) Invites Bids From Experienced Consultants To Provide Key Personnel To Assist The Departmental Authority's Engineer In The Supervision Of Widening And Strengthening Two Lane Highways With Paved Shoulders. 📍 Location: Rairangpur To Jashipur Section, Odisha 📅 Bid Submission Deadline: July 18, 2024, 5:00 Pm 💲 Tender Fee: Inr 10,000 💲 Earnest Money Deposit (Emd): Inr 100,000 Interested Consultants Must Possess The Necessary Qualifications And Experience In Highway Infrastructure Projects. Proposals Should Include Detailed Plans For The Widening And Strengthening Of The Specified Highway Sections, Along With A Comprehensive Project Management Approach. Keywords: Consultancy, Highway Infrastructure, Widening And Strengthening, Ce Nh, State Govt. And Ut, Road Construction, Engineering Services, Tender, Bid, Emd, Rairangpur To Jashipur Section, Odisha
Particulars Details
Title
Consultant To Provide Key Personnel To Assist Departmental Authoritys Engineer For Supervision Of Widening And Strengthening To Two Lane With Paved Shoulder From Km 59.594 To 60.042 And Km 60.292 To 63.400 (Missing Section Of Rairangpur To Jashipur S
Description
Consultant To Provide Key Personnel To Assist Departmental Authoritys Engineer For Supervision Of Widening And Strengthening To Two Lane With Paved Shoulder From Km 59.594 To 60.042 And Km 60.292 To 63.400 (Missing Section Of Rairangpur To Jashipur
Organisation CE-NH | State Govt. and UT
Tender Id 2024_CENH_103339_1
Reference
Number
BID SERVICE-03 2024-25
Tender Fee 10000
EMD 1 Lakh
Tender Value
Place Bhubaneswar
Link https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=502059
Start Date June 28, 2024 16:25
End Date

18/07/2024 ( Expired 345 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.

Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Read more
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Read more
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24

Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24

Read more
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise