Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Dispensary Building And Boundary Wall At Government Homeopathy Dispensary At Chhatrapada Under Chandbali Block For The Year 2023 24 In The Dist. Of Bhadrak.
|
Description |
Construction Of Dispensary Building And Boundary Wall At Government Homeopathy Dispensary At Chhatrapada Under Chandbali Block For The Year 2023 24 In The Dist. Of Bhadrak.
|
Organisation | CE RW I | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 62600 |
Tender Value | |
Place | Bhadrak |
Link |
AAAAAAAAAA Login to view |
Start Date | June 12, 2025 19:30 |
End Date |
20/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreRfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreRenovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Read morePackage-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp
Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreof your Industry type