Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Restoration Of Road Cut On The Carriageway Of The Existing Patiala Samana Patran Road Sh 10 By Punjab Sewage Board Patiala (Section Internal City Portion Samana) Rd 96.900 To 97.380 Km On Lhs
|
Description |
Restoration Of Road Cut On The Carriageway Of The Existing Patiala Samana Patran Road Sh 10 By Punjab Sewage Board Patiala (Section Internal City Portion Samana) Rd 96.900 To 97.380 Km On Lhs
|
Organisation | CE-PWD(B and R) | State Govt. and UT |
Tender Id | 2024_CEPW_126225_1 |
Reference Number |
Bid no. 9 dated 27.08.2024 |
Tender Fee | 10559 |
EMD | 94500 |
Tender Value | |
Place | District Patiala |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=256500 |
Start Date | August 28, 2024 18:25 |
End Date |
11/09/2024 ( Expired 291 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreEngagement of user fee agency on the basis of competitive bidding through e-tender kot-karor kalan fee plaza at km 205.000 from existing km 166.925 to km 221.380 on harike-zira-faridkot section of nh-15 in punjab
Engagement of user fee agency on the basis of competitive bidding through e-tender kot-karor kalan fee plaza at km 205.000 from existing km 166.925 to km 221.380 on harike-zira-faridkot section of nh-15 in punjab
Read moreReconstruction of khala (abhi ka khala) on badripur jamniwala parduni at link road damaged due to heavy monsoon km. 0/0 to 15/0. (sh- re-construction of rcc box cell bridge at rd. 7/915).
Reconstruction of khala (abhi ka khala) on badripur jamniwala parduni at link road damaged due to heavy monsoon km. 0/0 to 15/0. (sh- re-construction of rcc box cell bridge at rd. 7/915).
Read moreMaintenance by pdg. patch work on gohana baroda julana road from rd 6.00 to 13.00 km in sonipat distt. risk and cost of lord shive due to pre mature dlp (re-invited)
Maintenance by pdg. patch work on gohana baroda julana road from rd 6.00 to 13.00 km in sonipat distt. risk and cost of lord shive due to pre mature dlp (re-invited)
Read moreA/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.
A/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.
Read moreSpecial repair by providing wdg/stg. of various 6 nos. roads 80mm ipb on link to baptoli (id 3481) rd 0 to 1.32 km, relaying 80mm ipb and ccb on hodal hassanpur road to ramgarh ( id 3477) rd 0 to 0.65km, relaying ccb on hadal hassanpur road to bhando
Special repair by providing wdg/stg. of various 6 nos. roads 80mm ipb on link to baptoli (id 3481) rd 0 to 1.32 km, relaying 80mm ipb and ccb on hodal hassanpur road to ramgarh ( id 3477) rd 0 to 0.65km, relaying ccb on hadal hassanpur road to bhando
Read moreof your Industry type