Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Conslt Ret Outlt,Site Visit Upto 100 Km From Ro,Site Visit 100 To 200 Km From Ro,Site Visit Beyond
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2025/B/6418539 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 07, 2025 17:22 |
| End Date |
Expired
17/07/2025
Expired 325 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Read moreWork on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Stmc work on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Read moreConstruction and maintenance of road from l033-(link road) moungri to ajal beyond 4.5 km package no. jk14-4504, pmgsy-iv, batch-i of 2026-27, block-moungri, district udhampur. (using waste plastics 6.000 kms) length 6.000 kms
Construction and maintenance of road from l033-(link road) moungri to ajal beyond 4.5 km package no. jk14-4504, pmgsy-iv, batch-i of 2026-27, block-moungri, district udhampur. (using waste plastics 6.000 kms) length 6.000 kms
Read moreTransportation work of plants from nursery to plantation site at bundi
Transportation work of plants from nursery to plantation site at bundi
Read moreImprovement to nallah/waterway from shree siddeshwar temple to the fields from ch.0.00 km to ch.1.50 km at paliem in v.p. ucassaim paliem punola in aldona constituency.
Improvement to nallah/waterway from shree siddeshwar temple to the fields from ch.0.00 km to ch.1.50 km at paliem in v.p. ucassaim paliem punola in aldona constituency.
Read moreProviding and constructing of pcc road wark in from kodiyapatti to near jbvnl building towards hindustan bridge and from naya sringar house to jbvnl building boundry wall and from visheshwar vishwakarma house to pramod pandey house upto 236 m length
Providing and constructing of pcc road wark in from kodiyapatti to near jbvnl building towards hindustan bridge and from naya sringar house to jbvnl building boundry wall and from visheshwar vishwakarma house to pramod pandey house upto 236 m length
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreAnti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur
Anti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur
Read moreClearance of sludge and waste material of chattanwala drain from km. 0.000 to km. 25.000 in distt. bijnor for year 2026-27. lot-4
Clearance of sludge and waste material of chattanwala drain from km. 0.000 to km. 25.000 in distt. bijnor for year 2026-27. lot-4
Read moreof your Industry type