Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Non Patchable Road From Kabir Basti To Boontiya, Km 0/0 To 3/0.
|
| Description |
Non Patchable Road From Kabir Basti To Boontiya, Km 0/0 To 3/0.
|
| Organisation | PWD - CE AND AS | State Govt. and UT |
| Tender Id | 2025_CEPWD_493147_1 |
|
Reference Number |
E-NIT_30_2025_26_EE_CHURU_12 |
| Tender Fee | 1000 |
| EMD | 86340 |
| Tender Value | |
| Place | Churu |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=879445 |
| Start Date | August 07, 2025 23:00 |
| End Date |
Expired
25/08/2025
Expired 283 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Atal pragati path - widening of road and construction of cc road from rakhi darwaja to gupteshwar mahadev mandir km. 0/0 to 1/250
Atal pragati path - widening of road and construction of cc road from rakhi darwaja to gupteshwar mahadev mandir km. 0/0 to 1/250
Read moreWidening and strengthening of road from lunkaransar to baderan km 0/00 to 15/00 (ew)
Widening and strengthening of road from lunkaransar to baderan km 0/00 to 15/00 (ew)
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreRenewal of main road by sdbc from nh-74 gaindikhata to gujjar basti in constituency haridwar gradistt. haridwar under ar 2026-27 (km. 1 to 7 (800m))
Renewal of main road by sdbc from nh-74 gaindikhata to gujjar basti in constituency haridwar gradistt. haridwar under ar 2026-27 (km. 1 to 7 (800m))
Read moreConstruction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Construction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Read moreWork on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Stmc work on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Read moreImprovement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km
Improvement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km
Read morePatch repair work on dlp road nechhawa to swami ki dhani road 0/00 to 3/150 under sub dn. nechhawa
Patch repair work on dlp road nechhawa to swami ki dhani road 0/00 to 3/150 under sub dn. nechhawa
Read moreStrengthening of road from belonia to srinagar ch1100 km to 3950 km length 2850 km on engineering procurement construction epc mode
Strengthening of road from belonia to srinagar ch1100 km to 3950 km length 2850 km on engineering procurement construction epc mode
Read moreImprovement and strengthening of link road from lower samnal to pubowal chowk via baliwal km 0/0 to 11/470 sh imp. r/wall, cd,gsb,wmm, tarring work, side drain, cc pavement and road side furniture etc. under deposit industry deptt.
Improvement and strengthening of link road from lower samnal to pubowal chowk via baliwal km 0/0 to 11/470 sh imp. r/wall, cd,gsb,wmm, tarring work, side drain, cc pavement and road side furniture etc. under deposit industry deptt.
Read moreof your Industry type