Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Upgradation Work Of Existing Old Hvac Plant Of Pmssy At Sgpgi Campus Lucknow
|
Description |
Upgradation Work Of Existing Old Hvac Plant Of Pmssy At Sgpgi Campus Lucknow
|
Organisation | UP Rajkiya Nirman Nigam Ltd | State Govt. and UT |
Tender Id | 2024_UPRNN_960227_1 |
Reference Number |
UPGRADATION WORK OF EXISTING OLD HVAC PLANT OF PMSSY AT SGPGI CAMPUS LUCKNOW |
Tender Fee | 11800 |
EMD | 21.94 Lakh |
Tender Value | |
Place | LUCKNOW |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1669851 |
Start Date | September 30, 2024 14:30 |
End Date |
18/10/2024 ( Expired 248 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreDoor to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreUpgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Read moreReconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read moreJp/b862-208-md-t-4400/1017 for flare system package (demountable type) for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Flare system package (demountable type) for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreInternal infrastructure and land development work of south part of national maritime heritage complex at lothal gujarat india
Internal infrastructure and land development work of south part of national maritime heritage complex at lothal gujarat india
Read moreExpansion of existing fire and gas detection system at process plant, dahej plant ongc
Expansion of existing fire and gas detection system at process plant, dahej plant ongc
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreof your Industry type