Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Storm Water Drain On The Southern Side Along Nh 27 From Guruduwara Near Basistha Chariali To Jawahar Nagar (Ch. 0.000 Km To Ch. 1.140 Km)
|
| Description |
Construction Of Storm Water Drain On The Southern Side Along Nh 27 From Guruduwara Near Basistha Chariali To Jawahar Nagar (Ch. 0.000 Km To Ch. 1.140 Km)
|
| Organisation | Guwahati Metropolitan Development Authority | State Govt. and UT |
| Tender Id | 2025_GMDA_48711_1 |
|
Reference Number |
GMDA/DEV/06/2025/Pt/14 |
| Tender Fee | 20000 |
| EMD | 54 Lakh |
| Tender Value | - |
| Place | Basistha near NH-27 |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=77397 |
| Start Date | November 24, 2025 16:30 |
| End Date |
Expired
10/12/2025
Expired 308 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o
Read moreConstruction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
Construction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
Read moreConstruction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode
Construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode
Read moreConsultancy services for ae for supervision of construction of 4-lanning of ujjain-jhalawar section of nh-552g from ch.0.000 village khilchipura to ch.86.500 village aakli-kadiya (package-1) in madhya pradesh on epc mode under nh(o)
Consultancy services for ae for supervision of construction of 4-lanning of ujjain-jhalawar section of nh-552g from ch.0.000 village khilchipura to ch.86.500 village aakli-kadiya (package-1) in madhya pradesh on epc mode under nh(o)
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreEngagement of user fee agency through e-quotation for eight lane delhi-vadodara expressway from km 0.000 to km 129.017 on national highway no section of nh-148na design ch. 0.000 to 59.063 in haryana and rajasthan
Engagement of user fee agency through e-quotation for eight lane delhi-vadodara expressway from km 0.000 to km 129.017 on national highway no section of nh-148na design ch. 0.000 to 59.063 in haryana and rajasthan
Read moreIe services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.
Ie services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.
Read more4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreDe siltation and cleaning of drain along nh 27 from koinadhara to basistha chariali for the fy 2024 2025
De siltation and cleaning of drain along nh 27 from koinadhara to basistha chariali for the fy 2024 2025
Read moreof your Industry type