Tender Details

Particulars Details
Title
Dismentling The Existing Pcc,Removal Of Excess Earth,Pcc Work,Tiles Flooring,Ms Steel Framing,Ms Sh
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/R/421909
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date December 18, 2024 19:30
End Date
Expired 19/12/2024

Expired 666 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...

Tender Status: awarded
Additional Information: Average Turn Over of Last 3 Years: 2 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
Crompton Briz Air Deco 1200mm Lustre Brown crompton Crompton Briz Air Deco 1200mm Lustre Brown 12 ₹ 28800.000
NOTICE BOARD NA NA 4 ₹ 4600.000
Samsung MLT-D203S Black Toner Cartridge SAMSUNG Samsung MLT-D203S Black Toner Cartridge 60 ₹ 333600.000
file cover with printing AU file cover with printing 300 ₹ 3000.000
SIMMTRONICS 2GB Simmtronics SIMMTRONICS 2GB DDR2 14 ₹ 14000.000
File Tag Green Unbranded File Tag Green-v18 372 ₹ 49848.000
Microsoft Officestd 2016 SNGL OLP C Microsoft Microsoft & Officestd 2016 SNGL OLP C 1 ₹ 14800.000
Electrical Wire 4mm Bundle 90M finolex 4m-CU-AL 6 ₹ 37800.000
SURF EXCEL EASY WASH surf excel SURF EXCEL BLUE 15 ₹ 1638.750
MULTIMEDIA PROJECTOR Hitachi HITACHI CP-X2542WN 1 ₹ 37280.000
hp desktop hp HP Slimline 270-p020il 2 ₹ 64798.000
GODREJ COMPUTER TABKE C11 GODREJ INTERIO GODREJ COMPUTER TABKE C11 2 ₹ 17560.000
CDMA Trainer Tatame Tatame TTCDMATR 1 ₹ 49990.000
MEDICAL REIMBURSEMENT CLAIM FORM PARAS PARAS MEDICAL REIMBURSEMENT CLAIM FORM 10 ₹ 950.000
best and more reliable weighing scale Omron hn289 omron 25 ₹ 49999.750
Carrier split AC Carrier CAS18DF3N8F0/2018 1 ₹ 37850.000
File wrapper or flap NA wrapper 600 ₹ 2580.000
file cabinet four drawer (NV) N.V. NV-FC-001 1 ₹ 8900.100
HP 204A Cyan LaserJet Toner Cartridge CF511A hp HP 204A Cyan LaserJet Toner Cartridge CF511A 2 ₹ 6986.000
HP 204A Yellow LaserJet Toner Cartridge CF512A hp HP 204A Yellow LaserJet Toner Cartridge CF512A 2 ₹ 6986.000
Similar Tenders
Construction of boundary wall alongwith retaining wall shaheed samark daghwani at tihra gp kot (sh. construction of cc flooring, providing granite with grooved letters and providing ms gate)

Construction of boundary wall alongwith retaining wall shaheed samark daghwani at tihra gp kot (sh. construction of cc flooring, providing granite with grooved letters and providing ms gate)

Read more
Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-ii)

Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-ii)

Read more
Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-i)

Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-i)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Removal of excess earth slaughter house back side in udhagamandalam municipality

Removal of excess earth slaughter house back side in udhagamandalam municipality

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise