Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Of Panagal Nakrekal Road To Indloor Road From Km 0/0 To 11/2 In Nalgonda District ( Sub Work: Conducting Sub Soil Investigation Work For Hlb
|
| Description |
Widening And Strengthening Of Panagal Nakrekal Road To Indloor Road From Km 0/0 To 11/2 In Nalgonda District ( Sub Work: Conducting Sub Soil Investigation Work For Hlb
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 591472 |
|
Reference Number |
07/ PA to EE/NLG/2025-26, Dt.23.04.2025 |
| Tender Fee | 80 |
| EMD | 5647 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | April 28, 2025 21:00 |
| End Date |
Expired
12/05/2025
Expired 484 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of panagal - nakrekal road to indloor road from km 0/0 to 11/2 in nalgonda district
Widening and strengthening of panagal - nakrekal road to indloor road from km 0/0 to 11/2 in nalgonda district
Read moreWidening and strengthening of panagal - nakrekal road to indloor road from km 0/0 to 11/2 in nalgonda district ( sub work providing consultancy services for conducting topographical survey and preparation of plan and profile)
Widening and strengthening of panagal - nakrekal road to indloor road from km 0/0 to 11/2 in nalgonda district ( sub work providing consultancy services for conducting topographical survey and preparation of plan and profile)
Read moreWidening and strengthening of cherlapally at nam road to pitttampally from km 0/0 to 5/4 in nalgonda district ( sub work: conducting presurvey and sub soil investigation work for the proposed hlb at km 1/2-4
Widening and strengthening of cherlapally at nam road to pitttampally from km 0/0 to 5/4 in nalgonda district ( sub work: conducting presurvey and sub soil investigation work for the proposed hlb at km 1/2-4
Read morePre survey and preliminary sub soil investigation work for the proposed hlb
Reconstruction of high level bridege at km 0/8 to kuntala waterfall road in adilabad district under fdr scheme . sub work:- pre- survey and preliminary sub- soil investigation work for hlb
Read moreConducting soil investigation as per is 18921997,conducting soil investigation as per is 1892 1997
Read more
Widening and strengthening of nalgonda - devarakonda road to kurrampally via regatte from km 0/0 to 11/8 in nalgonda district (construction of high level bridge at km 2/8-10 on nalgonda - devarakonda road to kurrampally via regette in nalgonda district) (sub work conducting sub soil investigation
Widening and strengthening of nalgonda - devarakonda road to kurrampally via regatte from km 0/0 to 11/8 in nalgonda district (construction of high level bridge at km 2/8-10 on nalgonda - devarakonda road to kurrampally via regette in nalgonda district) (sub work conducting sub soil investigation
Read moreWidening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Widening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Read moreReconstruction of hl bridge and providing cc pavement on mahabubnagar - nalgonda road at km 155/6-10 in nalgonda district sub estimate for conducting the preliminary sub soil investigation work
Reconstruction of hl bridge and providing cc pavement on mahabubnagar - nalgonda road at km 155/6-10 in nalgonda district sub estimate for conducting the preliminary sub soil investigation work
Read morePre survey and sub soil investigation work for the proposed hlb at km 38/8
Construction of hlb in place of existing low level causeway at km 25/8 km 38/8 on adilabad to boath road in adilabad district .sub work:- pre- survey and preliminary sub- soil investigation work for the proposal hlb at km 38/8.
Read moreof your Industry type