Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Of Cherlapally At Nam Road To Pitttampally From Km 0/0 To 5/4 In Nalgonda District ( Sub Work: Conducting Presurvey And Sub Soil Investigation Work For The Proposed Hlb At Km 1/2 4
|
Description |
Widening And Strengthening Of Cherlapally At Nam Road To Pitttampally From Km 0/0 To 5/4 In Nalgonda District ( Sub Work: Conducting Presurvey And Sub Soil Investigation Work For The Proposed Hlb At Km 1/2 4
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 591480 |
Reference Number |
09/ PA to EE/NLG/2025-26, Dt.23.04.2025 |
Tender Fee | 163 |
EMD | 11491 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | April 28, 2025 21:00 |
End Date |
12/05/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreWidening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Widening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type