Tender Details
Particulars | Details |
---|---|
Title |
C/O Jeepable Road To Khawangi Kanda 0/00 To 2/400 (Sh Rofd,P/L Soling, Metalling And Tarring From Km 0/00 To 2/500)
|
Description |
C/O Jeepable Road To Khawangi Kanda 0/00 To 2/400 (Sh Rofd,P/L Soling, Metalling And Tarring From Km 0/00 To 2/500)
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_105152_1 |
Reference Number |
PW/KNR-E-Tender/25-760-65 dated 07-05-2025 |
Tender Fee | 2000 |
EMD | 1.84 Lakh |
Tender Value | |
Place | Kalpa, Kinnaur HP |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=154117 |
Start Date | May 13, 2025 14:30 |
End Date |
19/05/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreMtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Construction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Read moreWidening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Widening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreof your Industry type