Tender Details
Particulars | Details |
---|---|
Title |
On Turnkey Basis Construction Of Saner Dam And Micro Irrigation System Under Badadev Micro Irrigation Projcet, As Per Detailed Scope Of Work But Not Limited To That.
|
Description |
On Turnkey Basis Construction Of Saner Dam And Micro Irrigation System Under Badadev Micro Irrigation Projcet, As Per Detailed Scope Of Work But Not Limited To That.
|
Organisation | Engineer-in-Chief - Water Resources Department | State Govt. and UT |
Tender Id | 2024_WRD_369170_1 |
Reference Number |
1099/2024-25/Einc/Etendering/ dt.20-09-2024 |
Tender Fee | 51180 |
EMD | 50 Lakh |
Tender Value | |
Place | Jabalpur |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=445952 |
Start Date | November 05, 2024 21:30 |
End Date |
18/11/2024 ( Expired 176 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreSupply and installation in relation to setup up of laboratory at buck semen station katulpur, bankura on turnkey basis under paschim banga go-sampad bikash sanstha, kolkata-700106
Supply and installation in relation to setup up of laboratory at buck semen station katulpur, bankura on turnkey basis under paschim banga go-sampad bikash sanstha, kolkata-700106
Read moreConstruction of rcc ghat (1) construction of ghat above existing brahmpuri ghat near parking at omkareshwar, tehsil- punasa, district- khandwa (multiple ghat) minimum area 29700 sqm. on tkey contract as per detail scope of work ( but not limited
Construction of rcc ghat (1) construction of ghat above existing brahmpuri ghat near parking at omkareshwar, tehsil- punasa, district- khandwa (multiple ghat) minimum area 29700 sqm. on tkey contract as per detail scope of work ( but not limited
Read moreOn turnkey basis under bina complex irrigation and multipurpose project construction of madia power house of 21 mw capacity with all allied work, as per detailed scope of work but not limited to that
On turnkey basis under bina complex irrigation and multipurpose project construction of madia power house of 21 mw capacity with all allied work, as per detailed scope of work but not limited to that
Read moreWork of hydrogen gas cylinders testing, painting and providing and installation of new valves if required, as per is 3224 for 4x250 mw generators of unit-1 to 4 ctpp, chhabra as per gas cylinder rules 1981 under indian explosive act 1884 and 2004.
Work of hydrogen gas cylinders testing, painting and providing and installation of new valves if required, as per is 3224 for 4x250 mw generators of unit-1 to 4 ctpp, chhabra as per gas cylinder rules 1981 under indian explosive act 1884 and 2004.
Read moreConstruction/rectification of balance works/left out works of leisure valley adarsh awash yojna on as is where basis at tech zone-iv, greater noida west up, pertains to amrapali group of companies on epc basis at risk and cost of previous agency
Construction/rectification of balance works/left out works of leisure valley adarsh awash yojna on as is where basis at tech zone-iv, greater noida west up, pertains to amrapali group of companies on epc basis at risk and cost of previous agency
Read moreEmpanelment of agencies for the work of supply, installation and commissioning including 5 years cmc of etc - fpc based solar hot water system on turnkey basis across the state of jharkhand
Empanelment of agencies for the work of supply, installation and commissioning including 5 years cmc of etc - fpc based solar hot water system on turnkey basis across the state of jharkhand
Read moreProject management consultancy services for proof checking, construction supervision,quality assurance, quality control and quality audit for the work of construction of multi level flyover /grade separators at two junctions namely khajaguda jn, iiit jn and widening and development of 215 feet road from cp, cyberabad office to gachibowli jn and widening and development of road to 150 feet from anjaiah nagar to ramky tower road under engineering procurement construction (epc)/turnkey basis
Project management consultancy services for proof checking, construction supervision, quality assurance, quality control and quality audit for the work of construction of multi level flyovers/grade separators at two junctions namely khajaguda jn, iiit jn and widening and development of 215 feet road from cp cyberabad office to gachibowli jn and widening and development of road to 150 feet from anjaiah nagar to ramky tower rd and engineering procurement construction (epc)/turnkey basis.
Read moreProject management consultancy services for proof checking, construction supervision, quality assurance, quality control quality audit for the work of construction of 4 lane composite steel girder bridge on the pipeline road across fox sagar surplus nala under engineering procurement construction (epc)/turnkey basis.
Project management consultancy services for proof checking, construction supervision, quality assurance, quality control and quality audit for the work of construction of 4 lane composite steel girder bridge on the pipeline road across fox sagar surplus nala under engineering procurement construction (epc)/turnkey basis
Read moreof your Industry type