Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Under Pmagy Work Village Village Aspatpur Block Phulpur District Azamgarh.
|
| Description |
Under Pmagy Work Village Village Aspatpur Block Phulpur District Azamgarh.
|
| Organisation | U.P. State Construction and Infrastructure Development Corporation Ltd. | State Govt. and UT |
| Tender Id | 2025_SCIDC_991943_1 |
|
Reference Number |
048/EE/AZM/PM AJAY/24-25 dt-09-01-25 |
| Tender Fee | 1300 |
| EMD | 33000 |
| Tender Value | - |
| Place | azamgarha |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1752630 |
| Start Date | January 09, 2025 23:30 |
| End Date |
Expired
16/01/2025
Expired 615 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of conference hall at vikarabad of vikarabad district(balance work)
Construction of conference hall at vikarabad of vikarabad district(balance work)
Read moreBalance work to arch gate sri kaleshwara muktheshwara swamy vari devasthanam, kaleshwaram (v), mahadevpur (m), jayashankar bhupalpally district
Balance work to arch gate sri kaleshwara muktheshwara swamy vari devasthanam, kaleshwaram (v), mahadevpur (m), jayashankar bhupalpally district
Read moreDevelopment of common core infrastructure for integration of the unified campus at integrated education hub at kodangal at hakeempet, polepally village of vikarabad district (kada jurisdiction) (2nd call).
Development of common core infrastructure for integration of the unified campus at integrated education hub at kodangal at hakeempet, polepally village of vikarabad district (kada jurisdiction) (2nd call).
Read moreConstruction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreBt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Read moreSurvey, investigation, design, supply, erection, testing and commissioning of lis for supplementing water to suffering atchkat of 3997ha of d 76 of tlbc by lifting water from tungabhadra river near yedival village of manvi taluk, raichur district on turnkey basis, phase i
Work comprising of construction of intake structure, jack well cum pumphouse, pumping machineries (2 pumps), 33/6.6kv electrical substation with power transformer, 33kv transmission line, 110/33kv transformer bay with 33kv terminal bay, rising main including supply of spare parts and tools, o and m for five years after successful commissioning of the entire scheme on turnkey basis
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreUnder pmagy work village-samundpur block-phulpur district azamgarh.
Under pmagy work village-samundpur block-phulpur district azamgarh.
Read moreof your Industry type