Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work Of Con Of 11 Kv Bondla Feeder From Overhead To Underground Network From Primary Health Centre Usgao To Usgao Barazan Circle Under The Jurisdiction Of Section Office Usgaon, Sub Division Ii, Division X, Ponda.
|
Description |
Work Of Con Of 11 Kv Bondla Feeder From Overhead To Underground Network From Primary Health Centre Usgao To Usgao Barazan Circle Under The Jurisdiction Of Section Office Usgaon, Sub Division Ii, Division X, Ponda.&Amp#X0d
&Amp#X0d
|
Organisation | ELECTRICITY DEPARTMENT | State Govt. and UT |
Tender Id | 2024_ED_19158_1 |
Reference Number |
Tender No_39(2024-25)/CSC |
Tender Fee | 7500 |
EMD | 18.05 Lakh |
Tender Value | |
Place | Sub Div II, Div-X, Ponda |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=19596 |
Start Date | January 03, 2025 15:00 |
End Date |
13/01/2025 ( Expired 152 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreUrgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)
Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)
Read moreWork of con of left out lt overhead network to underground system under margao municipality areas in order to provide uninterrupted power supply to the consumers under sub-division-ii, fatorda, division-iv, margao
Work of con of left out lt overhead network to underground system under margao municipality areas in order to provide uninterrupted power supply to the consumers under sub-division-ii, fatorda, division-iv, margao
Read moreRampur health centre link road from 0.00 kmp to 2.30 km, pre monsoon patch repairing work of amta highway sub-division under howrah highway division in the district of howrah in the year of 2025-26
Rampur health centre link road from 0.00 kmp to 2.30 km, pre monsoon patch repairing work of amta highway sub-division under howrah highway division in the district of howrah in the year of 2025-26.
Read moreWork of renovation and revamping of 2x6.3 mva, 33/11kv velim substation and enhancing the capacity of substation from 2x6.3mva to 2x6.3mva, 1x10mva under the jurisdiction of sub div ii, chinchinim, division xvi, margao
Work of renovation and revamping of 2x6.3 mva, 33/11kv velim substation and enhancing the capacity of substation from 2x6.3mva to 2x6.3mva, 1x10mva under the jurisdiction of sub div ii, chinchinim, division xvi, margao
Read moreMaintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division during the year 2025-26 (group - ii)
Maintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division during the year 2025-26 (group - ii)
Read moreWork of con of lt (3 phase 6 wire) overhead line and service connection wire of consumers to underground system at newly erected manohar parrikar junction at parra under sub-division iii , mapusa
Work of con of lt (3 phase 6 wire) overhead line and service connection wire of consumers to underground system at newly erected manohar parrikar junction at parra under sub-division iii , mapusa
Read moreBifurcation of 11 kv falaknuma ug cable feeder
Bifurcation of overloaded 11kv falaknuma ug cable feeder emanating from 33/11kv falaknuma ss by erection of new 11kv feeder from the same ss by laying of 1.6km of 11kv 3x185sq.mm. xlpe ug cable along with bay extension and erection of 11kv vcb at 33/11kv falaknuma sub station in miralam section of miralam sub division of charminar division of hyderabad south circle under t and d improvement to original works under general category
Read moreConstruction of a 33kv network from raniganj ccc to the bogra 33 11kv sub station for power evacuation under asansol division
Construction of a 33kv network from raniganj ccc to the bogra 33 11kv sub station for power evacuation under asansol division
Read moreNctps ii 2 x 600 mw operation circle chemical division time bound works operational and testing assistance to coal lab and quality checking of various chemicals for a period of 308 days from 28 05 2025 to 31 03 2026
Nctps ii 2 x 600 mw operation circle chemical division time bound works operational &#x0d and testing assistance to coal lab and quality checking of various chemicals for a period of 308 &#x0d days from 28 05 2025 to 31 03 2026&#x0d
Read moreof your Industry type