Tender Details
Particulars | Details |
---|---|
Title |
Cleaning, De Silting And Maintenance Of Mora Bharalu River From Isbt To Fatasil Junction Under Div Vi For The Year 2024 25
|
Description |
Cleaning, Desilting And Maintenance Of Major River &Amp#X0d
Channels (As Packaged) Under Mitigation Of Urban Flood &Amp#X0d
In Guwahati City Under Guwahati Municipal Corporation &Amp#X0d
For The Year 2024 25.
|
Organisation | Guwahati Municipal Corporation | State Govt. and UT |
Tender Id | 2025_GMC_41904_4 |
Reference Number |
GER/CE/2461/2024/12 Date_04/01/2025 |
Tender Fee | 5500 |
EMD | 5.2 Lakh |
Tender Value | |
Place | Guwahati |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=67399 |
Start Date | January 23, 2025 15:30 |
End Date |
29/01/2025 ( Expired 107 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreMaintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreRequest for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreIndependent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Read moreRequest for pre qualification of bidders for maintenance works to be taken up on risk and cost of the concessionaire or contractor under the jurisdiction of ro jaipur
Request for pre qualification of bidders for maintenance works to be taken up on risk and cost of the concessionaire or contractor under the jurisdiction of ro jaipur
Read moreProviding and laying of wmm 7.5 cm, dbm 6.00 cm and bc 4.00 cm including cleaning of rd surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 0 km 30 on road pithewala-kalibuli-bahla under 96 rcc/45 tf
Providing and laying of wmm 7.5 cm, dbm 6.00 cm and bc 4.00 cm including cleaning of rd surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 0 km 30 on road pithewala-kalibuli-bahla under 96 rcc/45 tf
Read moreof your Industry type