Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Anaipalayam 33/11 Kv Ss
|
| Description |
Construction Of Control Room And Other Allied Civil Works For The Proposed Anaipalayam 33/11 Kv Ss In Tirupur Edc On Total Turnkey Basis.
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_607900_1 |
|
Reference Number |
CE/D/CBE/C-02/2025-26 |
| Tender Fee | 0 |
| EMD | 1.74 Lakh |
| Tender Value | - |
| Place | Anaipalayam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=726522 |
| Start Date | October 04, 2025 16:30 |
| End Date |
Expired
13/10/2025
Expired 347 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreErection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i
Erection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreConstruction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreKambiliyampatty 33/11 kv ss
Construction of control room and other civil works for the proposed kambiliyampatty 33/11 kv ss in palladam edc on total turnkey basis
Read moreMangalam 33/11 kv ss
Construction of control room and other civil works for the proposed mangalam 33/11 kv ss at pudupalayam in tirupur edc on total turnkey basis.
Read moreKathankanni 33/11 kv ss
Construction of control room and other allied civil works for the proposed kathankanni 33/11 kv ss in palladam edc on total turnkey basis.
Read more33/11 kv syednagar ss
Erection, testing and commissioning of 1 no. new 33/11kv indoor substation with 1x12.5 mva ptr, 33kv and 11kv lines at syed nagar, masab tank of mehdipatnam division in hyderabad central circle pertaining to master plan, hyderabad circle under tandd improvement works.
Read moreof your Industry type