Tender Details
Particulars | Details |
---|---|
Title |
Providing/Laying Bm / Pc On Service Lanes From Barnala Railway Crossing To Ludhiana Railway Crossing Adjoining To Fly Over
|
Description |
Providing/Laying Bm / Pc On Service Lanes From Barnala Railway Crossing To Ludhiana Railway Crossing Adjoining To Fly Over
|
Organisation | Department of Local Government | State Govt. and UT |
Tender Id | 2024_DLG_129565_5 |
Reference Number |
E-TENDER-/NAGAR COUNCIL, DHURI/2024-25/34 |
Tender Fee | 3922 |
EMD | 49520 |
Tender Value | |
Place | M.C. DHURI |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262576 |
Start Date | November 09, 2024 14:30 |
End Date |
18/11/2024 ( Expired 204 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreProviding 20mm thick premix carpet on central avenue road (road no.4) from anandpur sahib hydel channel bridge to pro office at nangal township.
Providing 20mm thick premix carpet on central avenue road (road no.4) from anandpur sahib hydel channel bridge to pro office at nangal township.
Read moreConstruction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh
Construction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreProviding and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Providing and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Read moreUpgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode
Upgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode
Read moreof your Industry type