Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair/Maintenance Of 300/250/200 Mm Dia Ms / Gi Pipe Line As And When Required Before And During Monsoon 2025 Within Mine Area At Bina Project
|
| Description |
Repair/Maintenance Of 300/250/200 Mm Dia Ms / Gi Pipe Line As And When Required Before And During Monsoon 2025 Within Mine Area At Bina Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_332999_1 |
|
Reference Number |
B/EM/eTender/2024-25/90 dt. 20.03.2025 |
| Tender Fee | 0 |
| EMD | 5200 |
| Tender Value | - |
| Place | Bina Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345204 |
| Start Date | March 22, 2025 14:30 |
| End Date |
Expired
03/04/2025
Expired 560 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Read moreCam-divn:replacement of 200nb ms pipes in cwr pipe line and service water lines in water treatment system as and when required in ktps vii stage
Cam-divn:replacement of 200nb ms pipes in cwr pipe line and service water lines in water treatment system as and when required in ktps vii stage
Read moreEntry and mid level desktop computer,antifoaming agent for treatment of stp water,ci sluice valve 300 mm dia bore,gm gate valve 40 mm bore,timer switch with clock,pvc water storage tank 500 ltrs,gi pipe medium grade 15 mm dia bore,gi pipe meduim grade 50 mm dia bore,water meter 80 mm bore,ci foot valve 100 mm dia,water level indicator digital,ci foot valve 200 mm dia,submerssible cable 4 sq mm 3 core copper conductor1100 volts grade,float valve with epoxy coated aluminium rod and high density ball 15 mm,gun metal hydrant valve 63mm,float valve with epoxy coated aluminium rod and high density ball 50mm,gi socket med grade 80mm,brass nozzle 63 mm dia,ci non return valve 100 mm dia,ms flange 100 mm dia bore,lead pig bar,submerssible cable 2.5 sq mm 3 core copper conductor1100 volts grade,self closing taps copper alloy, chromium plated 20 mm,ci foot valve 150 mm dia,float valve with epoxy coated aluminium rod and high density ball 25 mm,ci butterfly valve 80 mm dia,rubber hose real of 20 mm dia,single phase preve
Entry and mid level desktop computer,antifoaming agent for treatment of stp water,ci sluice valve 300 mm dia bore,gm gate valve 40 mm bore,timer switch with clock,pvc water storage tank 500 ltrs,gi pipe medium grade 15 mm dia bore,gi pipe meduim grade 50 mm dia bore,water meter 80 mm bore,ci foot valve 100 mm dia,water level indicator digital,ci foot valve 200 mm dia,submerssible cable 4 sq mm 3 core copper conductor1100 volts grade,float valve with epoxy coated aluminium rod and high density ball 15 mm,gun metal hydrant valve 63mm,float valve with epoxy coated aluminium rod and high density ball 50mm,gi socket med grade 80mm,brass nozzle 63 mm dia,ci non return valve 100 mm dia,ms flange 100 mm dia bore,lead pig bar,submerssible cable 2.5 sq mm 3 core copper conductor1100 volts grade,self closing taps copper alloy, chromium plated 20 mm,ci foot valve 150 mm dia,float valve with epoxy coated aluminium rod and high density ball 25 mm,ci butterfly valve 80 mm dia,rubber hose real of 20 mm dia,single phase preve
Read morePvc insulated copper cable single core and multi core circular sheathed with flexible conductor (v2) isi marked to is 694,pvc insulated copper cable single core and multi core circular sheathed with flexible conductor (v2) isi marked to is 694,shrouded copper conductor busbar 160amp tpn 4 bar w type with pvc sleeves rybg dsl 4 bar,electro hydraulic thrustor brake complete mdt 150 - 18kg including thrustor 18 kg, type st - 520 415 v, complete set,electro hydraulic thrustor brake complete mdt 200 - 18kg including thrustor 18 kg, type st - 520 415 v, complete set,electro hydraulic thrustor brake complete mdt 250 - 18kg including thrustor 18 kg, type st - 520 415 v, complete set,electro hydraulic thrustor brake complete mdt 300 - 18kg including thrustor 34 kg, type st - 520 415 v, complete set,cable resting trolly ms four wheel with four ball bearing,pneumatic time relay delay 0 - 60 sec.,step down transformer 415v slash 110 v capacity of 1 kva.,gear couling size s4 space of bore 110mm with half g
Pvc insulated copper cable single core and multi core circular sheathed with flexible conductor (v2) isi marked to is 694,pvc insulated copper cable single core and multi core circular sheathed with flexible conductor (v2) isi marked to is 694,shrouded copper conductor busbar 160amp tpn 4 bar w type with pvc sleeves rybg dsl 4 bar,electro hydraulic thrustor brake complete mdt 150 - 18kg including thrustor 18 kg, type st - 520 415 v, complete set,electro hydraulic thrustor brake complete mdt 200 - 18kg including thrustor 18 kg, type st - 520 415 v, complete set,electro hydraulic thrustor brake complete mdt 250 - 18kg including thrustor 18 kg, type st - 520 415 v, complete set,electro hydraulic thrustor brake complete mdt 300 - 18kg including thrustor 34 kg, type st - 520 415 v, complete set,cable resting trolly ms four wheel with four ball bearing,pneumatic time relay delay 0 - 60 sec.,step down transformer 415v slash 110 v capacity of 1 kva.,gear couling size s4 space of bore 110mm with half g
Read moreHammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by
Hammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by
Read moreRepair/ maintenance of 300/250/200 mm dia. ms / gi pipe line as and when required before and during monsoon 2024 within mine area at bina project
Repair/maintenance of 300/250/200 mm dia. ms / gi pipe line as and when required before and during monsoon 2024 within mine area at bina project.
Read moreRepair/maintenance of 300/250/200 mm dia. ms / gi pipe line as and when required before and during monsoon 2024 within mine area at bina project.
Repair/maintenance of 300/250/200 mm dia. ms / gi pipe line as and when required before and during monsoon 2024 within mine area at bina project.
Read moreDismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Read moreInstallation dismantling shifting of pump motor pontoon starter field switches pipelines (flexible/ms/gi etc) cables hoses along with related accessories and works before and during monsoon as and when required for monsoon 25 at ksl project.
Installation dismantling shifting of pump motor pontoon starter field switches pipelines (flexible/ms/gi etc) cables hoses along with related accessories and works before and during monsoon as and when required for monsoon 25 at ksl project.
Read moreCleaning of mine magazine area before monsoon rain at chikla mine.
Cleaning of mine magazine area before monsoon rain at chikla mine.
Read moreof your Industry type