Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Ee/Kidivision/E Nit 07 (E)/2025 26 Sl 22
|
| Description |
Reparing And Painting The Slope At Kachuberia Surface Jetty At Mouza Kachuberia Under Sagar Irrigation Sub Division.In Connection With Ganga Sagar Mela 2026
|
| Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
| Tender Id | 2025_IWD_902108_4 |
|
Reference Number |
WBIW/EE/KIDIVISION/e-NIT- 07 (e)/2025-26 |
| Tender Fee | 0 |
| EMD | 28866 |
| Tender Value | |
| Place | SAGAR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2040987 |
| Start Date | September 15, 2025 15:30 |
| End Date |
Expired
08/10/2025
Expired 287 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Wbiw/ee/kidivision/e-nit- 10 (e)/2025-26 sl 1
Beautification of sagar irrigation bungalow campus under kakdwip irrigation division in connection with ganga sagar mela-2026
Read moreWbiw/ee/kidivision/e-nit- 11 (e)/2025-26 sl 8
Supply, erection and installation of 22 nos. glow sign boards at camp office(4 nos), bunglow (2nos) ,jetties (12 nos) and 4 nos. at gangasagar sea beach during gangasgar mela 2026 from 01.01.2026 to 20.01.2026 ( 20 days)
Read moreWbiw/ee/kidivision/e-nit- 12 (e)/2025-26 sl 7
Emergent restoration of damaged sundarban embankment damaged during full moon kotal on and from 04.11.2025 to 07.11.2025 along with low pressure depression in between ch. 0.60km and 0.68km. for a length of 75m at mouza gobardhanpur
Read moreWbiw/ee/kidivision/e-nit- 13 (e)/2025-26 sl 1
Supply and installation of sign board marking different dyke at lot-8 in connection with gs mela-2026 within the jurisdiction of kakdwip irrigation division
Read moreWbiw/ee/kidivision/e-nit- 15 (e)/2025-26 sl 3
Emergent restoration of sundarban embankment damaged due to full moon kotal on and from 04.12.25 to 07.12.2025 for a length of 50.00 m in betweench 12.50 km to 12.54 km and ch 19.18 km to 19.19 of gobadia banstala river left right embankment
Read moreWbiw/ee/kidivision/e-nit- 03 (e)/2025-26 sl 5
Construction of a ring bundh for a length of 275 m in between ch 2.30 km to 2.60 km facing river walls creek at mouza- dakshin lakshminarayanpur under patharpratima irrigation sub division of kakdwip irrigation division
Read moreWbiw/ee/kidivision/e-nit- 04 (e)/2025-26 sl 1
M/r to kamalpur single vent sluice mouza- kamalpur facing muriganga khal under sagar (i) sub-division of kakdwip (i) division
Read moreWbiw/ee/kidivision/e-nit- 05 (e)/2025-26 sl 1
Repair renovation of dormitory building for use of estate management staffs posted at sagar sinchan inspection bangalow under kakdwip at gangasagar, block and ps - sagar dist - south 24 parganas
Read moreWbiw/ee/kidivision/e-nit- 06 (e)/2025-26 sl 1
Repair renovation of dormitory building for use of estate management staffs posted at sagar sinchan inspection bangalow under kakdwip at gangasagar, block and ps - sagar dist - south 24 parganas.
Read moreWbiw/ee/kidivision/e-nit- 08 (e)/2025-26 sl 42
M/r to boundary wall including allied works inside kakdwip irrigation compound ,mouza-ganeshpur,block-kakdwip of kakdwip irrigation division in connection with g.s.mela-2026
Read moreof your Industry type