Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Operational Manpower For Different Grid Sub Stations Under Transmission Circle Gumla For The Period From 01.04.2025 To 31.03.2026.
|
Description |
Supply Of Operational Manpower For Different Grid Sub Stations Under Transmission Circle Gumla For The Period From 01.04.2025 To 31.03.2026.
|
Organisation | JSEB | State Govt. and UT |
Tender Id | 2025_JSEB_99549_1 |
Reference Number |
484/PR/JUSNL/2024-25 |
Tender Fee | 11800 |
EMD | 1.9 Lakh |
Tender Value | |
Place | Gumla |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=133690 |
Start Date | March 12, 2025 23:45 |
End Date |
27/03/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreHiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreEngagement of carrying contractor for carrying of drugs dressings and other articles from esi central medical stores to different esi institutions under esi mb scheme wb
Engagement of carrying contractor for carrying of drugs dressings and other articles from esi central medical stores to different esi institutions under esi mb scheme wb
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWater supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0
Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0
Read moreBiennial rate contract for 4 nos. manpower supply for assistance of condition based monitoring of critical inst. coal sampling from coal pipe and misc work, mp dept.
Biennial rate contract for 4 nos. manpower supply for assistance of condition based monitoring of critical inst. coal sampling from coal pipe and misc work, mp dept.
Read moreof your Industry type