Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing, Re Building And Co Axial Boring Of Crowd Drum Shaft Housing Both Side (Left Side And Right Side) Of Crowd Frame Of Be 3 And Be 4 Rope Shovel, Working At Bina Project
|
| Description |
Repairing, Re Building And Co Axial Boring Of Crowd Drum Shaft Housing Both Side (Left Side And Right Side) Of Crowd Frame Of Be 3 And Be 4 Rope Shovel, Working At Bina Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_312482_1 |
|
Reference Number |
Bina/SO(Excv)/Tender/24-25/22 dt 12.07.2024 |
| Tender Fee | 0 |
| EMD | 1400 |
| Tender Value | - |
| Place | Bina Project, NCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323840 |
| Start Date | July 13, 2024 14:30 |
| End Date |
Expired
23/07/2024
Expired 771 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning obstruction of submergence area at right and left side of shelgaon barrage medium project on tapi river
Cleaning obstruction of submergence area at right and left side of shelgaon barrage medium project on tapi river
Read moreDismantling, repairing and fitment of crowd platform, railing and repairing / reconditioning of damaged / cracked left side final drive housing of be-2 rope shovel working at bina project
Dismantling, repairing and fitment of crowd platform, railing and repairing / reconditioning of damaged / cracked left side final drive housing of be-2 rope shovel working at bina project
Read moreCo-axial boring of boom and arm housing pc 2000-8 exc-2997 hydraulic shovel working at bina project.
Co-axial boring of boom and arm housing pc 2000-8 exc-2997 hydraulic shovel working at bina project.
Read moreDismantling, repairing, fabricating and fitting of crowd gear box cover of be-5 rope shovel working at bina project
Dismantling, repairing, fabricating and fitting of crowd gear box cover of be-5 rope shovel working at bina project.
Read moreWelding and coaxial boring of 3rd intermediate shaft bearing housing (inner side) and 2nd intermediate shaft bearing housing (left side and right side) of 2 nos. propel gearbox assembly of be195 10m3 electric rope shovel at bina project.
Welding and coaxial boring of 3rd intermediate shaft bearing housing (inner side) and 2nd intermediate shaft bearing housing (left side and right side) of 2 nos. propel gearbox assembly of be195 10m3 electric rope shovel at bina project.
Read moreRe-welding and co-axial boring of boom bush housing (lhs and rhs), crowd clutch housing, lower swing shaft bearing housing of be-7 shovel working in east section.
Re-welding and co-axial boring of boom bush housing (lhs and rhs), crowd clutch housing, lower swing shaft bearing housing of be-7 shovel working in east section.
Read moreof your Industry type