Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Repairing And Fitting Of Crowd Gear Box Cover And Hoist Gear Box Cover Of Be 2, Be 3 And Be 4 Rope Shovel And Repairing Of Broken / Worn Out Eyes Of 15 Nos. Crawler Links Of Be 195 Shovel, Working At Bina Project.
|
Description |
Dismantling, Repairing And Fitting Of Crowd Gear Box Cover And Hoist Gear Box Cover Of Be 2, Be 3 And Be 4 Rope Shovel And Repairing Of Broken / Worn Out Eyes Of 15 Nos. Crawler Links Of Be 195 Shovel, Working At Bina Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_319411_1 |
Reference Number |
Bina/SO(Excv)/Tender/24-25/53 dt 24.10.2024 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | Bina Project, NCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331483 |
Start Date | October 25, 2024 14:30 |
End Date |
05/11/2024 ( Expired 209 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling and of track chain, roller (06) nos., idler opening, fitting and hick changing, broken bolt removal, thread making, 04 nos. quad and 02 nos. feed sprocket repairing of idm30 drill sl. no. dr-228 at nichitpur ocp sijua area
Dismantling and fitti of track chain, roller (06) nos. idler opening, fitting and hick changing, broken bolt removal, thread making, 04 nos. quad and 02 nos. feed sprocket repairing of idm30 drill sl. no. dr-228 at nichitpur ocp sijua area
Read moreDismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Read moreRepairing/rebuilding and line boring of 08 nos. cracked/ worn out lift cylinder rear pin housing (02 nos. per machine) of 10 cum cat992k payloader (sl. no. 500293, 500298, 500300 and 500302) working at kocp
Repairing/rebuilding and line boring of 08 nos. cracked/ worn out lift cylinder rear pin housing (02 nos. per machine) of 10 cum cat992k payloader (sl. no. 500293, 500298, 500300 and 500302) working at kocp. scope of work as per tender documents.
Read moreRepairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Read moreRepairing, cleaning, raising up of manholes, road gullies and box channel alongwith providing and fixing of missing/broken road gully/ manholes cover and frames and fitting of m.s. grills and cover over manholes and road gully also includes casting o
Repairing, cleaning, raising up of manholes, road gullies and box channel alongwith providing and fixing of missing/broken road gully/ manholes cover and frames and fitting of m.s. grills and cover over manholes and road gully also includes casting o
Read moreComplete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Read moreRepairing of isolator, vcb and main transformer 63 kva, 3.3 kv alongwith magnetic amplifiers -03 nos. (hoist, crowd and swing/ propel) in hmb-581 shovel of jharkhand ocp
Repairing of isolator, vcb and main transformer 63 kva, 3.3 kv alongwith magnetic amplifiers -03 nos. (hoist, crowd and swing/ propel) in hmb-581 shovel of jharkhand ocp.
Read moreRepairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Read moreRepairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Repairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Read moreRepairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Read moreof your Industry type