Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Tender Announcement For Ttps Mech.Ii Ahp Unit Iii Overhauling Works 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Tenders For The Annual Overhauling Works Of Ttps Mech.Ii Ahp Unit Iii, Including The Cleaning Of The Ash Water Pump House Sump. 🏗️ 📅 Submission Deadline: July 18, 2024, 2:00 Pm Tender Fee: Inr 1000 Interested Contractors Must Submit Detailed Proposals Outlining Their Methodology, Experience, And Pricing For The Overhauling Works. Proposals Must Adhere To The Specifications And Timelines Outlined In The Tender Document. Keywords: Tneb Limited, Ttps, Annual Overhauling Works, Ahp Unit Iii, Ash Water Pump House Sump Cleaning, State Govt. And Ut, Tender, Procurement| Particulars | Details |
|---|---|
| Title |
Ttps Mech.Ii Ahp Unit Iii Annual Overhauling Works Cleaning Of Ash Water Pump House Sump During Annual Overhaul 2024 2025
|
| Description |
Ttps Mech.Ii Ahp Unit Iii Annual Overhauling Works Cleaning Of Ash Water Pump House Sump During Annual Overhaul 2024 2025
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_459509_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.295/2024-25 |
| Tender Fee | 0 |
| EMD | 1000 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546198 |
| Start Date | July 03, 2024 19:30 |
| End Date |
Expired
18/07/2024
Expired 815 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreTggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Read moreTmd service charges for deputation of service engineer inspection, adjustment and alignment of hangers supports of piping connected to turbine auxiliaries during capital overhaul 2026 27
Tmd service charges for deputation of service engineer inspection, adjustment and alignment of hangers supports of piping connected to turbine auxiliaries during capital overhaul 2026 27
Read moreKtps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreTggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Read moreBmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type