Tender Details

Particulars Details
Title

AAAAAAAAAA

Login to view
Description
A/R M/O To M Ps Flats/Bungalows Under Sub Div I Of Pa Wd I During 2025 26 (Sh: Providing Manpower For Vacant Premises Under Sub Div I)
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 1.13 Lakh
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date July 04, 2025 17:22
End Date

11/07/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

Read more
Provision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam

Provision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam

Read more
Ca no cwe/amb/south-03 of 2025-26 provision of certain bldg works in unit lines under b/r-i for ge (south) ambala cant

Ca no cwe/amb/south-03 of 2025-26 provision of certain bldg works in unit lines under b/r-i for ge (south) ambala cant

Read more
Providing metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel

Providing metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel

Read more
Upgradation of road dhuri mullowal road to badshahpur alal via ghanauri kalan salempur including maintenance of road for 5 years under head 5054 rb_10 roads 2025-26

Upgradation of road dhuri mullowal road to badshahpur alal via ghanauri kalan salempur including maintenance of road for 5 years under head 5054 rb_10 roads 2025-26

Read more
Cwe/chm-26/2025-26 special repair to retaining wall from shakti dwar towards pine marg, mes ib and other technical areas under age b/r i of ge chandimandir at chandimandir mil station

Cwe/chm-26/2025-26 special repair to retaining wall from shakti dwar towards pine marg, mes ib and other technical areas under age b/r i of ge chandimandir at chandimandir mil station

Read more
Ked/18 of 2025-26 dated 04.07.2025 for the work of creation of gurah-ii feeder by way of laying of new ht line from receiving station gurah kathua in respect of jpdcl electric sub division ramkot of jpdcl electric division kathua under ut capex budge

Creation of gurah-ii feeder by way of laying of new ht line from receiving station gurah kathua in respect of jpdcl electric sub division ramkot of jpdcl electric division kathua under ut capex budget for the year 2025-26

Read more
Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26

Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26

Read more
Wbudma/ee/slrd/nit-06(e)2025 26 of executive engineer, salt lake reclamation division

Comprehensive refurbishment of room no 304 to 306, 308 to 311 and conference hall of suda building at ilgus campus, salt lake city, kolkata106 under salt lake reclamation sub-division-i of salt lake reclamation division

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise