Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Renewal Of Murukaliy To Shekkal Mudi Bt Road Km 2/0 To 4/0 (Unicode 077007 R05 ) (Length 2000 M, Width 3.60 M)
|
| Description |
Providing Renewal Of Murukaliy To Shekkal Mudi Bt Road Km 2/0 To 4/0 (Unicode 077007 R05 ) (Length 2000 M, Width 3.60 M)
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_MAWS_338459_1 |
|
Reference Number |
1524/2023/E1-4 |
| Tender Fee | 0 |
| EMD | 79700 |
| Tender Value | |
| Place | VALPARAI MUNICIPALITY |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | July 10, 2023 19:30 |
| End Date |
Expired
14/07/2023
Expired 1066 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of rain damages (pdna) on link road from kankani to pakche in g.p. nako km. 0/00 to 2/110 (sh- providing and laying grading-i, grading-ii and grading-iii from km. 0/00 to 2/00
Restoration of rain damages (pdna) on link road from kankani to pakche in g.p. nako km. 0/00 to 2/110 (sh- providing and laying grading-i, grading-ii and grading-iii from km. 0/00 to 2/00
Read moreUnder the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreRehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.
Read moreConstruction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreGeneral sabarimala festival works 2025 26 improvements by providing bm bc to adoor pattazhi road at ch 0 00 to 2 900 general civil work general civil work
General sabarimala festival works 2025 26 improvements by providing bm bc to adoor pattazhi road at ch 0 00 to 2 900 general civil work general civil work
Read moreConstruction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Construction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Read moreof your Industry type