Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Construction Of Approaches Of Steel Bridge Single Span 40.54 Mtr C/C Of Bearing At Rd 223400 Of Sirhind Feeder Canal Crossing From Kotli Sangar To Jhabelwali
|
Description |
Estimate For Construction Of Approaches Of Steel Bridge Single Span 40.54 Mtr C/C Of Bearing At Rd 223400 Of Sirhind Feeder Canal Crossing From Kotli Sangar To Jhabelwali
|
Organisation | Department of Water Resources | State Govt. and UT |
Tender Id | 2025_WR_135185_1 |
Reference Number |
0018/Harike Canal Division/2024-25 |
Tender Fee | 2590 |
EMD | 7631 |
Tender Value | |
Place | Executive Engineer harike Canal division Ferozepur |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=273149 |
Start Date | February 20, 2025 15:30 |
End Date |
07/04/2025 ( Expired 14 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreCs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh
Cs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreConstruction of foot over bridge at km.3/150 (jipmer hospital) for the rectification of blackspot py (03)-09 (2017-19) on puducherry to tindivanam section of nh -32 (old nh-66) in the state of puducherry (ut)
Construction of foot over bridge at km.3/150 (jipmer hospital) for the rectification of blackspot py (03)-09 (2017-19) on puducherry to tindivanam section of nh -32 (old nh-66) in the state of puducherry (ut)
Read moreConstruction of bituminous road from from nh 31 near cinema hall to kalibari of paresh roy with 70 mtr. long guard wall at ward no-04 under maynaguri municipality
Construction of bituminous road from from nh 31 near cinema hall to kalibari of paresh roy with 70 mtr. long guard wall at ward no-04 under maynaguri municipality
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type