Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Steel Bridge Single Span 76.94 Mtr C/C Of Bearing At Rd 439292 Of Rajasthan Feeder Canal Crossing And Construction Of Steel Bridge Single Span 35.048 Mtr C/C Of Bearing On Sirhind Feeder Canal At Rd 383813 Vill Khudia To Sehna Khera
|
Description |
Construction Of Steel Bridge Single Span 76.94 Mtr C/C Of Bearing At Rd 439292 Of Rajasthan Feeder Canal Crossing And Construction Of Steel Bridge Single Span 35.048 Mtr C/C Of Bearing On Sirhind Feeder Canal At Rd 383813 Vill Khudia To Sehna Khera
|
Organisation | Government of Punjab |
Tender Id | 2023_WR_102224_7 |
Reference Number |
E-tender Notice No.03/Abohar Canal Ground Water |
Tender Fee | 10000 |
EMD | 20.07 Lakh |
Tender Value | |
Place | Executive Engineer, Abohar Canal and Ground Water |
Link | https://eproc.punjab.gov.in |
Start Date | May 12, 2023 17:30 |
End Date |
22/06/2023 ( Expired 694 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreLining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreDevelop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Develop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Read moreRectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode
Construction of six laning grade separated structure at sangteda, at manpura machedi and lakher and white topping of service road at 05nos. locations on gurgaon kotputli jaipur section of nh 48 in the state of rajasthan on epc mode
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreof your Industry type