Tender Details

Particulars Details
Title
Construction Of Approaches And Adjacent Roads For Steel Bridge Single Span 73.866 Mtr. C/C Of Bearing At Rd 195814 Of Rajasthan Feeder Canal Crossing From Kotkapura To Faridkot And Steel Bridge Single Span 45.00 Mtr. C/C Of Bearing On Sirhind Feeder
Description
Construction Of Approaches And Adjacent Roads For Steel Bridge Single Span 73.866 Mtr. C/C Of Bearing At Rd 195814 Of Rajasthan Feeder Canal Crossing From Kotkapura To Faridkot And Steel Bridge Single Span 45.00 Mtr. C/C Of Bearing On Sirhind Feeder
Organisation Department of Water Resources | State Govt. and UT
Tender Id 2025_WR_136015_1
Reference
Number
13/Rajasthan/FZR/2024-25
Tender Fee 15900
EMD 3.47 Lakh
Tender Value
Place Executive Engineer Rajasthan Feeder Division FZR
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=274814
Start Date March 06, 2025 16:30
End Date

27/03/2025 ( Expired 45 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)

Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)

Read more
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode

Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode

Read more
Construction of steel bridge including the supply and fabrication of steel girder, installation of bearings, over hindon canal and feeder canal for fire tender movement at new ashok nagar for delhi- ghaziabad- meerut namo bharat corridor.

Construction of steel bridge including the supply and fabrication of steel girder, installation of bearings, over hindon canal and feeder canal for fire tender movement at new ashok nagar for delhi- ghaziabad- meerut namo bharat corridor.

Read more
Design and construction of 1x40 mtr span steel trussed bridge at angaikote tulail gurez on epc mode (engineering procurement and construction mode)

Design and construction of 1x40 mtr span steel trussed bridge at angaikote tulail gurez on epc mode (engineering procurement and construction mode)

Read more
Design and construction of 1x30 mtr steel girder bridge over astan nallah at dawar gurez on main road on epc mode (engineering procurement and construction mode)

Design and construction of 1x30 mtr steel girder bridge over astan nallah at dawar gurez on main road on epc mode (engineering procurement and construction mode)

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of 2 no single span bridges 7.50 mtr each eff. skew over warring drain and 8.00 mtr each eff over sarainaga drain xing kotkapura shri muktsar road including approaches in district shri muktsar sahib

Construction of 2 no single span bridges 7.50 mtr each eff. skew over warring drain and 8.00 mtr each eff over sarainaga drain xing kotkapura shri muktsar road including approaches in district shri muktsar sahib

Read more
Construction of minor bridge on ghatanji shivani runza road sh-290 in km 121 ta. ghatanji , dist yavatmal (a/c main canal of kochi ambezari m. i. tank rd 2468 )

Construction of minor bridge on ghatanji shivani runza road &amp#x0d sh-290 in km 121 ta. ghatanji , dist yavatmal (a/c main canal &amp#x0d of kochi ambezari m. i. tank rd 2468 )

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise