Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Approaches And Adjacent Roads For Steel Bridge Single Span 73.866 Mtr. C/C Of Bearing At Rd 195814 Of Rajasthan Feeder Canal Crossing From Kotkapura To Faridkot And Steel Bridge Single Span 45.00 Mtr. C/C Of Bearing On Sirhind Feeder
|
Description |
Construction Of Approaches And Adjacent Roads For Steel Bridge Single Span 73.866 Mtr. C/C Of Bearing At Rd 195814 Of Rajasthan Feeder Canal Crossing From Kotkapura To Faridkot And Steel Bridge Single Span 45.00 Mtr. C/C Of Bearing On Sirhind Feeder
|
Organisation | Department of Water Resources | State Govt. and UT |
Tender Id | 2025_WR_136015_1 |
Reference Number |
13/Rajasthan/FZR/2024-25 |
Tender Fee | 15900 |
EMD | 3.47 Lakh |
Tender Value | |
Place | Executive Engineer Rajasthan Feeder Division FZR |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=274814 |
Start Date | March 06, 2025 16:30 |
End Date |
27/03/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreDesign and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreConstruction of 65 mtr. span motorable bridge through type with rcc foundation, single lane with 4.75 mtr. carriage - way width over river marsudar at sumbal machna marwah along with the approaches on both sides in district kishtwar under nabard
Construction of 65 mtr. span motorable bridge through type with rcc foundation, single lane with 4.75 mtr. carriage - way width over river marsudar at sumbal machna marwah along with the approaches on both sides in district kishtwar under nabard
Read moreConstruction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreDesign and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Read moreof your Industry type